Similar Projects
SPCC Exterior Ceiling Replacement
Bidding
$243,375 est. value
Miami, FL 33132

Relocatable Classrooms Exterior Renovations and Repairs
Term Contract, Alteration
Bidding
FL

Palm Beach County Sheriff's Office Exterior Hardening
Post-Bid
West Palm Beach, FL

Kendall Campus - Deferred Maintenance - Building M
Post-Bid
Miami, FL 33132

Hudson Hills Manor: Office Building Exterior Work
Results
Hudson, FL 34667

Construction of Cannon Platforms
Results
Saint Augustine, FL 32084

Stucco Repair and Exterior Painting for TPD District III (Sheltered Market Solicitation)
Alteration
Bidding
Tampa, FL 33610

Atlantic Community High School - Exterior Stair Replacement
Post-Bid
$1,500,000 est. value
Delray Beach, FL 33445

Repair Exterior Wall Sections of Casa
Results
$250,000 to $500,000 est. value
Saint Augustine, FL 32084

Safety Decking at Colin's Dream Skate Park
Alteration
Bidding
$130,000 est. value
Orange City, FL 32763

Structural Repair to Exterior Metal Pan Stairs at BAK Middle School
Post-Bid
West Palm Beach, FL 33407

Replace Guardrails and Handrails, Biscayne NP
Results
$100,000 to $250,000 est. value
Homestead, FL

City Hall Sealing, Weatherproofing and Building Repair
Alteration
Bidding
West Palm Beach, FL 33401

Awning Replacement at Sarasota County Jail
Post-Bid
Less than $25,000 est. value
Sarasota, FL 34237

Z1DA--Remove Polycarbonate Barrier From Atrium Skylights and Canteen
Results
West Palm Beach, FL 33410

Last Updated 01/28/2022 09:50 AM
Project Title

Pine Trail Elementary School - Replace Gutters and Downspouts

Physical Address View project details and contacts
City, State (County) Ormond Beach, FL 32174   (Volusia County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $256,008
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The general scope of the work is to remove all existing gutters and downspouts and replace them with new pre-finished aluminum gutters and extruded aluminum downspouts, field painted at existing locations. This scope is intended to define work required to replace the existing gutter and downspout system throughout the campus at buildings 1 through 11. (Apply new finish to interior of gutters at building #12 to minimize future corrosion.) 1. Existing gutters, downspouts and leader boxes to be replaced at existing locations. Fabricate and install per details. 2. Rework flashing components at rake and gable conditions in building corner terminations. 3. Clean out existing stormwater connections to insure there is no blockage and piping is free of debris. Existing PVC adaptors to remain, clean and prep. 4. Scratched, chipped, rust stained or damaged finish on metal roof and soffit panels to be touched up as required with matching color upon completion. 5. Clean and restore site to pre-project conditions as directed by the Owner. 6. Replace splash blocks with new at existing and proposed locations.

Details

Division 07 - Thermal and Moisture Protection, Roof Specialties, Manufactured Gutters and Downspouts.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents