Similar Projects
Wellfield Improvements - Phase 2
Bidding
Lake Worth, West Palm Beach, FL 33467

Pipeline Wet Tapping and Line Stop Continuing Construction Contract
Term Contract
Post-Bid
$5,500,000 est. value
West Palm Beach, FL 33416

Purchase and Delivery of Grinder Pump with Accessories, Assembled, (Duplex Pump System)
Post-Bid
West Palm Beach, FL 33415

Reduced Pressure Principle Backflow Prevention Assemblies
Results
FL

Country Club Village Infrastructure Upgrade
Results
Less than $7,577,000 est. value
Boca Raton, FL 33432

Pipeline Cleaning Services
Term Contract
Post-Bid
West Palm Beach, FL 33415

Water Main Subaqueous Crossings
Results
Less than $937,000 est. value
Delray Beach, FL 33444

Pump Control Systems, Yaskawa, Service, and Purchase of Pump Controllers, Term Contract
Term Contract
Post-Bid
FL

Neighborhood Road Program District 1, Year 4, Project 2
Results
Less than $3,600,000 est. value
Lake Worth, FL 33460

Aerial (Pipe) Crossing, Maintenance Services
Term Contract
Post-Bid
Palm Beach, FL

Neighborhood Road Program District 2, Year 4 Road and Utility Project
Results
Less than $3,002,890 est. value
Lake Worth, FL 33460

Pre-Qualification of Vendors Ductile Iron-Pipe and Fittings
Term Contract
Post-Bid
West Palm Beach, FL

Old Jupiter Creek and Casseekey Island Subaqueous Water Main Crossings (W1704C and W1908)
Results
Less than $500,000 est. value
Jupiter, FL 33458

Centrifugal Dewatering 12" x 8" Self-Priming Pumps - Trailer Mounted
Post-Bid
FL

Sewage, Discharge and Submersible Wastewater Pumps
Term Contract
Results
Haverhill, FL 33415

Last Updated 04/29/2021 03:31 AM
Project Title

Raw Watermain Improvements for Surficial Aquifer (SA) Wells 8A-12A and Site Demolition for SA Wells 6-12 (W1817B)

Physical Address View project details and contacts
City, State (County) Jupiter, FL 33458   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, equipment and materials necessary to perform raw water main improvements including but not limited to construction of 6”, 8”, 12” and 18” PVC raw watermain with DI fittings, 6”, 8” and 12” butterfly valves, 2” PVC electrical conduit and pull boxes from the Central Blvd South High Service Pump Station Building to new Wells 8A, 9A, 10A, and 11A located on Central Boulevard between Jupiter Gardens Drive and Jupiter Park Drive, and future Well 12A to be located at Jupiter Village Park, well site demolition at existing Wells 6, 7, 8, 9, 10, 11, and 12, abandonment and removal of existing AC, PVC and DI pipe, abandonment by grouting filling existing 8” and 12” raw watermain, site restoration, and all other work required.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents