Similar Projects
Groundwater and Leachate Sampling
Alteration
Bidding
Springfield, IL

(IDIQ)(MAC) for Environmental Services and Remedial Actions
Post-Bid
$50,000 to $250,000 est. value

(IDIQ)(MAC) for Environmental Services and Remedial Actions
Post-Bid
$50,000 to $250,000 est. value

Asbestos Abatement at Richwoods High School
Results
Peoria, IL 61600

Asbestos Abatement at Northmoor Primary School
Results
Peoria, IL 61614

F108--Environmental testing Testing for Radon and Lead
Post-Bid
Danville, IL - Danville, IN 46122

Asbestos Abatement at Whittier Primary School
Results
Peoria, IL 61606

Solid Waste and Recyclable Collection Services
Term Contract
Post-Bid
Glen Carbon, IL

Asbestos Floor Tile Abatement
Results
Less than $85,000 est. value
Hillsboro, IL 62049

Asbestos Abatement at Locust Elementary School
Post-Bid
Marengo, IL 60152

Asbestos Abatement Services
Term Contract
Results
$17,250 to $39,650 est. value
Galesburg, IL

Asbestos Abatement at Highland Elementary School
Post-Bid
Stillman Valley, IL 61084

Interior Renovations And Asbestos Abatement
Renovation
Results
Less than $145,000 est. value
Sandoval, IL

Trash Removal Services
Post-Bid
Galesburg, IL

Asbestos Abatement Services
Results
Springfield, IL

Last Updated 05/19/2022 04:55 PM
Project Title

Spring Road Tributary Proposed Restoration Improvement

Physical Address View project details and contacts
City, State (County) Oakbrook Terrace, IL 60181   (DuPage County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Soliciting to restore Spring Road Tributary (aka - Oak Brook Tributary), within the City limits. The Tributary is an excavated channel that passes primarily through a residential area. Additionally, a small unnamed tributary to the mainstem will also be restored. A total stream reach of 4,700 linear feet (+/-9,400 linear feet of streambank) was evaluated for restoration. Based on a completed study, a total of 2,819 feet of streambank requires restoration. Additionally, all non-native trees and shrubs adjacent to the 4,700 linear feet of stream will removed and the herbaceous groundcover restored per the engineering plans. The Contractor shall also provide 3-years of maintenance and monitoring of the installed vegetation in accordance with the “Spring Road Tributary, Oakbrook Terrace, IL – Native Planting and Seeding and BMP Performance Standards and Specifications”, dated October 27, 2021, prepared by Christopher B Burke Engineering, Ltd

Details

Division 32 - Exterior Improvements, Wetlands Restoration.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents