Similar Projects
Summit County Fairgrounds - Phase IA
Renovation, Infrastructure
Conception
$500,000 CJ est. value
Coalville, UT 84017

Olympic View Development
New Construction, Infrastructure - 1,600,000 SF
Conception
$854,000,000 CJ est. value
Park City, UT 84060

Yarrow Park City Mixed-Use
Demolition, New Construction, Infrastructure - 5,000 SF
Design
$116,000,000 CJ est. value
Park City, UT 84060

Yarrow Park City Mixed-Use
Demolition, New Construction, Infrastructure - 5,000 SF
Design
$116,000,000 CJ est. value
Park City, UT 84060

RFP D/B - Park City Dirt Jump Park Redesign and Build
Infrastructure
Bidding
$420,000 CJ est. value
Park City, UT 84060

2023 Summit County Slurry Seal Project
Infrastructure
Bidding
$217,151 CJ est. value
Coalville, UT 84017

Mountain Life Church Expansion
New Construction, Addition - 45,956 SF
Post-Bid
Park City, UT 84098

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Udot Region 4 Wash Rack Installation Various Locations
Term Contract, Infrastructure
Results

UDOT Wanship MS4 Project
Term Contract, Infrastructure
Results
Wanship, UT

Harmons at the Junction
Demolition, New Construction, Infrastructure - 76,000 SF
Pending Verification
$20,000,000 CJ est. value
Park City, UT 84098

Harmons at the Junction
Demolition, New Construction, Infrastructure - 76,000 SF
Pending Verification
$20,000,000 CJ est. value
Park City, UT 84098

RFP - Highway 40 Corridor Spatial Study
Term Contract
Conception
Coalville, UT 84017

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

US-40 Wasatch Co Line to SR-32 Pvmt and Structures
Infrastructure
Results
$467,731 est. value

Last Updated 02/03/2023 07:39 AM
Project Title

SR32 Trail Project - Phase 1

Physical Address View project details and contacts
City, State (County) Kamas, UT 84036   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $818,122 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Summit County is seeking a bid proposal to build approximately 6,000 feet of multi-use asphalt path (8 feet wide) along Utah State Route 32 between Marion and Kamas. See the attached Request for Proposal for detailed work scope and plans.Question Submission Close Date 6/7/2022 1:00 PM MDT The principal items of work are approximately as follows: 1,630 CY of Trail Excavation 2,340 CY of Trail Untreated Base Course 980 TN of Trail Hot-Mix Asphalt 12,800 SF of Right-of-Way Improvements.The entire project is to be substantially complete by September 1, 2022. Liquidated Damages will be enforced at $1,000 per day the project is not substantially complete.Questions regarding the proposal should be directed to: Steve Dennis (435) 336-3293 sdennis@summitcounty.org Each bidder must submit a bid bond from an approved surety company on forms provided by the Surety Company; or in lieu thereof, certified check, or cashier's check for not less than 5% of the total amount of the bid, made payable to Summit County as evidence of good faith and a guarantee that if awarded the contract, the bidder will execute the contract and furnish the contract bonds as required. The right to reject any or all bids is reserved.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents