Similar Projects
Phase 1 - Tower Terrace Road W/O Barnsley to Alburnett Road Grading and Drainage
Conception
$4,400,000 est. value
Cedar Rapids, IA 52407

USACE UPRR Culverts CC
Conception
$5,000,000 est. value
Cedar Rapids, IA

Ditch Improvement
Infrastructure
Bidding
$125,000 to $250,000 est. value
Colfax, IA 50054

Pipe Culverts
Term Contract
Bidding
$125,000 to $250,000 est. value
Glenwood, IA 51534

Wanatee Tributary Restoration
Infrastructure
Post-Bid
$147,000 est. value
Marion, IA

Camp Dodge S-05 Parking Lot and S-38 Drainage Improvements
Infrastructure
Post-Bid
Johnston, IA

Jesup Drainage Ditch
Results
$153,885 est. value
Jesup, IA

Jesup CSD Drainage Improvements
Results
$86,500 est. value
Jesup, IA 50648

USACE McLoud Run LWR CC
Conception
$2,500,000 est. value
Cedar Rapids, IA

Pipe Culverts
Infrastructure
Bidding
$125,500 to $250,000 est. value
Grinnell, IA 50112

Drainage District No 82 Open Ditch and Lateral B Cleanout
Infrastructure
Post-Bid
Algona, IA

Middle Cedar WMA Flood Mitigation Structures
Results
$1,116,000 est. value

Phase 3 - Tower Terrace Road from C Avenue to W/O Barnsley Lane Grading and Drainage
Conception
$2,100,000 est. value
Cedar Rapids, IA 52407

RCB Culvert New - Twin Box
Infrastructure
Bidding
$500,000 to $750,000 est. value
IA

Drainage District No. 12 Drainage Repairs
Infrastructure
Post-Bid
Bondurant, IA

Reported 06/04/2022 12:00 AM
Project Title

Scott Community College - Main Campus - Entrance Drainage Improvements

Physical Address View project details and contacts
City, State (County) Riverdale, IA 52722   (Scott County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to provide construction of a bypass storm sewer line, pipe repairs, and erosion control improvements.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents