Similar Projects
Homestead Phase 4
New Construction, Infrastructure - 7,900 SF
Conception
$80,000,000 CJ est. value
Logan, UT 84321

Foreign-Language Center - Utah State University
New Construction, Infrastructure
Design
$14,500,000 CJ est. value
Logan, UT 84321

Logan Meadows Business Park
New Construction, Infrastructure - 83,560 SF
Design
$12,300,000 CJ est. value
Logan, UT 84321

US-89; MP 467.8-478.5, Shoulder Barrier Barrier Treatments
Infrastructure
Bidding
$1,500,000 CJ est. value
Cove, UT 84320

Aggie Village Parking Lot Remodel
Infrastructure
Bidding
$485,000 CJ est. value
Logan, UT 84321

Logan District Courts Lighting Upgrade
Infrastructure
Sub-Bidding
$305,268 CJ est. value
Logan, UT 84321

Uintah Indian Irrigation Project
Term Contract
Post-Bid
$471,000 est. value

Cemetery Phase II
Infrastructure, Alteration
Post-Bid
River Heights, UT 84321

100 South Roadway and Drainage Improvements
Infrastructure
Results
Providence, UT

East Bench-Garr Spring Culvert
Infrastructure
Results
$15,000 est. value
Millville, UT 84326

Berntson Estates Residential Subdivision
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Logan, UT 84341

100 West Executive Suites
Demolition, New Construction, Infrastructure - 80,920 SF
Pending Verification
$24,400,000 CJ est. value
Logan, UT 84321

Jack in The Box / Logan
New Construction, Infrastructure - 2,341 SF
Design
$715,000 CJ est. value
Logan, UT 84321

500 East Water Line Replacement Project
Infrastructure
Bidding
$893,000 CJ est. value
River Heights, UT 84321

Construction of the Pitcher Well - House
New Construction, Infrastructure
Post-Bid
$180,000 CJ est. value
Cornish, UT 84308

Last Updated 06/12/2023 05:11 PM
Project Title

Utah State University Innovation Campus Pond Renovation

Physical Address View project details and contacts
City, State (County) North Logan, UT 84341   (Cache County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of: 1. Demolition and disposal of 600+ LF of the existing pond walls and existing precast concrete inlet and outlet structures. 2. Excavation of 2700 + CY of soil to enlarge the pond volume. 3. Construction of 800 + LF of 8-inch thick and 4 feet high pond walls. 4. Construction of a concrete sediment pond 5. Construction of 3600 + LF of USU Standard Type 1 sidewalk. 6. Installation of an 15320 + SF of geotextile fabric, an EPDM Liner, and River rock of 8-inch thickness. 7. Installation of 50 + LF of 6" HDPE Corrugated pipe for planter shelves. 8. Installation of a 3-ft x 3-ft and 3-ft x 4-ft precast concrete box and saw cuts to connect to existing storm drain pipes and install an orifice plate. 9. Installation of 3 waterman gates and 3 aerators. 10. Construction of 4 ADA ramps and 2 crosswalk pavement markings. 11. Removing and replacing trees and installing plants in planter shelves and garden areas. 12. The improvements will be installed at the Utah State University Innovation Campus in North Logan, Utah. 13. All structures, piping, and fittings required to serve the project as shown on the plan set. Construction is expected to commence August 2023.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents