Similar Projects
Calais Road Repaving Project
Infrastructure
Bidding
Randolph, NJ 07869

Main Avenue Streetscape Project - Long Hill Township
Infrastructure, Alteration
Bidding
Gillette, NJ 07933

Brook Lawn Drive Improvement Project
Post-Bid
Long Valley, NJ 07853

Naughright Road Improvement Project Section 2
Post-Bid
$325,000 est. value
Long Valley, NJ 07853

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Proposed Improvements to Granniss Avenue
Results
Morris Plains, NJ 07950

Improvements to Post Lane, Munn Avenue and Cottage Place
Infrastructure
Bidding
$600,000 to $640,000 est. value
Ridgewood, Riverdale, NJ 07457

Naughright Road Improvement Project Section 3
Post-Bid
Long Valley, NJ 07853

Improvements to Waughaw Road Project
Results
Montville, NJ 07045

Reconstruction of Various Streets in Mount Tabor, Phase V
Post-Bid
Parsippany, NJ 07054

Two Bridges Wastewater Treatment Plant Site Restoration
Results
$300,000 est. value
Lincoln Park, NJ 07035

Asphalt Paving
Post-Bid

Proposed Improvements to Taft Avenue, Polk Court and Garfield Avenue
Results
$68,999 est. value
Victory Gardens, NJ 07801

Continental Drive Improvements - Phase 1
Post-Bid
Budd Lake, NJ 07828

2020 Road Resurfacing / Curb and Sidewalk Program
Results
$1,443,072 est. value
Parsippany, NJ 07054

Last Updated 10/26/2021 11:26 AM
Project Title

Puddingstone Heights Road Reconstruction Program Phase I

Physical Address View project details and contacts
City, State (County) Parsippany, NJ 07869   (Morris County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists primarily of the milling & resurfacing, full depth reconstruction and installation of sanitary sewer main in High Ridge Road, Long Ridge Road and Pinnacle Road. The project will also include the installation of drainage structures and drainage piping. Quantities will be provided prior to the start of construction. Major estimated quantities are as follows: Excavation, Unclassified 2,900 CY Hot Mix Asphalt Milling, 3" or less 9,000 S.Y. HMA 9.5M64 Surface Course 1,900 Tons HMA 19M64 Base Course 2,500 Tons Granite Block Curb 6,600 LF 15-inch RCP Storm Pipe 1,500 LF 3-inch SDR 21 Sanitary Sewer Pipe 3,970 LF

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents