Similar Projects
11th Avenue south of Talmadge Street - 642444105 - City of Kearney
Infrastructure
Conception
$500,000 CJ est. value
Kearney, NE 68845

Terminal Building Expansion - City of Kearney
Renovation, Infrastructure
Design
$5,000,000 CJ est. value
Kearney, NE 68847

The Catholic Newman Center
New Construction, Infrastructure - 24,000 SF
Design
$11,600,000 CJ est. value
Kearney, NE 68847

UNK/UNMC Rural Health Education Building - BP Core and Shell (BP 5)
New Construction, Infrastructure - 112,210 SF
Sub-Bidding
$65,000,000 CJ est. value
Kearney, NE 68849

Culverts, General (All Classes)
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Kearney, NE 68847

Bridges, General (All Classes)
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Beaver, NE 68869

Northwest Industrial Site Development - Utility Improvements
Infrastructure
Results
Elm Creek, NE

2022 Part 2 Improvements - 56th Street & Avenue N Turning Lanes
Infrastructure
Results
$1,063,315 CJ est. value
Kearney, NE 68847

New Elementary School - Elm Creek Public Schools
Addition, Demolition, New Construction, Infrastructure
Pending Verification
$11,980,000 CJ est. value
Elm Creek, NE 68836

Evergreen Road Paving - County of Buffalo
Infrastructure
Pending Verification
$250,000 CJ est. value
Kearney, NE 68847

Turkey Creek Fourth Subdivision
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Kearney, NE 68847

Driveway Replacement - Single Family Homes
Infrastructure
Post-Bid
Kearney, NE 68847

Midtown Office Building- 2022 Ave A Project
New Construction, Infrastructure
Results
$664,095 CJ est. value
Prairie Center, NE 68870

Rural Health Complex - University of Nebraska at Kearney
New Construction, Infrastructure
Pending Verification
$85,000,000 CJ est. value
Kearney, NE 68849

2023 Street Improvements
Infrastructure
Post-Bid
$500,000 CJ est. value
Pleasanton, NE 68866

Last Updated 08/18/2023 09:53 AM
Project Title

Mid-States Irrigation Building

Physical Address View project details and contacts
City, State (County) Center, NE 68847   (Buffalo County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project received zoning approval from the Planning Commission for the City of Kearney on July 21, 2023. No other applications or building permits have been submitted. Information regarding the architect and general contractor has not been disclosed. A firm construction timeline has not been set, however construction is not expected to begin prior to spring 2024.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents