Similar Projects
Fair View High School - Chico Unified School District
Renovation
Conception
$14,058,000 est. value
Chico, CA 95926

Mammoth High School
Renovation
Design
Mammoth Lakes, CA 93546

San Francisco University High School
New Construction - 49,000 SF
Design
San Francisco, CA 94115

Bowditch Middle School New Drama and Science Buildings
New Construction - 33,250 SF
Bidding
$2,000,000 est. value
Foster City, CA 94404

360/11F Indio High School Greenhouse Project
Renovation
Bidding
$544,444 est. value
Indio, CA 92201

John F Kennedy High School - Phase 1
Renovation
Post-Bid
$15,100,000 est. value
Los Angeles, CA 91344

Preconstruction and Lease-Leaseback Services
New Construction
Post-Bid
Berkeley, CA 94703

Suzanne Middle School New Two Story 10 Classroom Science and Technology Building and New Gymnasium
New Construction - 16,672 SF
Results
$17,000,000 est. value
Walnut, CA 91789

Design, DSA Approval and Construction of a Modular Auxiliary Gymnasium Building at Beckman High School
New Construction - 8,580 SF
Results
Irvine, Tustin, CA 92780

Arroyo High School New Building Part Two
New Construction
Construction
San Lorenzo, CA 94580

Paradise Junior High Modernization Classrooms & Steam Lab
Renovation, Addition
Construction
$9,200,000 est. value
Paradise, CA 95969

Head Royce School South Campus
New Construction, Renovation - 1,500 SF
Design
Less than $500,000 CJ est. value
Oakland, CA 94602

Santa Barbara High School Visual Arts Design Academy Project
New Construction, Demolition
Bidding
$4,300,000 est. value
Santa Barbara, CA 93103

Preconstruction and Lease-Leaseback Services for Vista Del Lago High School CTE Addition
Addition
Post-Bid
$9,500,000 est. value
Moreno Valley, CA 92555

Sport Field Renovations - Olive Middle School Soccer And Baseball Fields
Renovation
Results
$850,000 est. value
Baldwin Park, CA 91706

Last Updated 07/11/2022 08:17 AM
Project Title

Palo Alto High School - Tower Building Modernization

Physical Address View project details and contacts
City, State (County) Palo Alto, CA 94301   (Santa Clara County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: A. Accessibility: 1) Addition of an elevator on the exterior of the two-story Administration Building (Bldg. 1500) which will be seismically separated from the existing building. 2) Addition of ramp to the west end to access the porch and a second ramp to access the finish floor elevation. 3) Addition of interior ramp and stair at the Meeting Room. 4) Provide accessible restrooms and single-occupant Staff Toilets. B. Building Systems: 1) Remove existing furnace, fan, and ductwork in the Basement. 2) Replace the existing forced air heating and ventilating system with a new variable refrigerant flow system. 3) Provide a central fresh air system to service all units. 4) Replace partial existing fire sprinkler system with new fully automatic fire sprinkler system throughout. 5) Provide new fire alarm system. 6) Provide additional power receptacles to most rooms. 7) Provide new lighting system in lay-in ceilings except in classrooms and Meeting Room. C. Architectural: 1) Paint interior. 2) Replace all existing flooring. 3) Refinish, patch, and clean the historic Meeting Room to mimic the original architectural style (not a historically accurate restoration). 4) Adjust room layouts. D. Site Improvements: 1) Create a new large terrace on north side of the Building. 2) Sitework is limited to the installation of the terrace which will encroach into an existing grass area. An existing asphalt concrete paving patch and shrubbery will need to be removed.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents