Similar Projects
Chickasaw Trail Forcemain
Infrastructure
Post-Bid
$1,679,560 est. value
Orlando, FL 32885

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Infrastructure Locator Contractor
Term Contract
Results
Orlando, FL 32801

Master Agreement for Water Distribution Construction Services, Lake Nona Boulevard Water Main Extension, Water Main Extension Boggy Creek North Phase 2A, and Neighborhood R and R Program Project Waterfront Estates Subdivision
Results
Orlando, FL 32824

South Water Reclamation Facility Flow Meter Improvements
Results
Less than $2,186,000 est. value
Orlando, FL 32819

McCoy Road Facility Watermain Improvements Project
Results
Orlando, FL 32812

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Water Main Improvements on Military Trail, Central Boulevard, and at the Water Treatment Facility
Results
Lake Worth, Orlando, FL 33463

Construction of a Potable/Drinking Water Main and Sewer Force Main
Results
Apopka, FL 32712

Water Line Stop Contractor
Infrastructure
Results
Orlando, FL

Econlockhatchee Trail Parallel Water Main
Infrastructure
Results
$1,079,498 est. value
Orlando, FL

Hiawassee Road Force Main Replacement at SR 408
Infrastructure
Results
$1,342,842 est. value
Orlando, FL 32835

Lake of the Woods to Al Coith Park Drainage Improvements
Infrastructure
Results
$2,849,500 est. value
Orlando, FL 32806

North/South Building Fan Coil Unit Chilled Water Actuator Controlled Valves Replacement
Infrastructure
Results
$120,000 est. value
Orlando, FL 32819

Conserv I 36 Reclaimed Water Main Extension
Infrastructure
Results
$1,196,000 est. value
Orlando, FL 32824

Last Updated 01/24/2022 02:43 AM
Project Title

Lake Underhill at Chickasaw Trail Forcemain Replacement

Physical Address View project details and contacts
City, State (County) Orlando, FL 32885   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $576,480
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, equipment, and materials for the construction of the facilities consisting of, but not limited to, the improvements of the equipment and structures associated with the following: 1. Removal of approximately 1,162 linear feet (LF) of existing wastewater forcemain and grout-filling of approximately 316 LF of existing wastewater forcemain. 2. Installation of approximately 1,598 LF of new wastewater forcemain including 16- inch and 12-inch Polymer of Vinyl Chloride (PVC) pipe as well as 16-inch High Density Polyethylene (HDPE) pipe.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents