Similar Projects
RheTech Colors Warehouse Addition
Addition, Infrastructure - 51,286 SF
Conception
$5,500,000 CJ est. value
Sandusky, OH 44870

Fremont Avenue Self Storage Building
New Construction, Infrastructure - 9,960 SF
Conception
$1,100,000 CJ est. value
Sandusky, OH 44870

Roadway Minor Rehab - SR 2
Infrastructure
Design
$8,374,367 CJ est. value
Huron, OH 44839

SR 2 - Bridge Preservation
Infrastructure, Renovation
Design
$12,320,000 CJ est. value
Huron, OH 44839

Sanitary Sewer and Watermain Replacement Project (Rebid)
Infrastructure
Bidding
$353,000 CJ est. value
Vermilion, OH 44089

Sanitary Sewer and Watermain Replacement Project (Rebid)
Infrastructure
Bidding
$353,000 CJ est. value
Vermilion, OH 44089

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Liberty Avenue Water Main Replacement, Phase 2
Infrastructure
Post-Bid
Vermilion, OH

Kelleys Island Glacial Grooves Erosion Protection Bid Package 2 - Site Improvements (Erie County)
Infrastructure
Results
$1,590,000 est. value
Kelleys Island, OH 43438

Repairs and Resurfacing Interchange 118 Ramps Milepost 118.60 Rebid
Infrastructure
Results
$4,545,544 CJ est. value
Huron, OH 44839

Cedar Point ESports Arena
New Construction, Infrastructure
Pending Verification
$28,000,000 CJ est. value
Sandusky, OH 44870

Bait House Brewery Expansion
Addition, Infrastructure, Renovation - 2,107 SF
Pending Verification
$700,000 CJ est. value
Sandusky, OH 44870

Cedar Point Esports Arena
New Construction, Infrastructure
Conception
$28,000,000 CJ est. value
Sandusky, OH 44870

US 6 - Resurfacing, Undivided System
Infrastructure
Design
$1,376,450 CJ est. value
Sandusky, OH 44870

Lighting - SR 2
Infrastructure
Bidding
$400,000 CJ est. value
Vermilion, OH 44089

Last Updated 03/31/2023 10:13 AM
Project Title

Huntington Street Waterline Replacement

Physical Address View project details and contacts
City, State (County) Kelleys Island, OH 43438   (Erie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Expected, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Civil Engineer - 03/02/23
Owner View project details and contacts
Architect View project details and contacts
Description

For the following project: Huntington Street Waterline Replacement Village of Kelleys Island, Ohio In accordance with the Plans and Specifications prepared by Bramhall Engineering and Surveying Co. (the Engineer), the project consists of installation of a new 8 waterline, hydrants and appurtenances, replacement of service laterals, pavement reconstruction and widening, minor storm sewer installation, driveway repair, grading work, seeding and mulching and maintenance of traffic. There will be no Pre-Bid Meeting. Questions by prospective bidders concerning this project should be directed in writing to Bramhall Engineering and Surveying Co., Chris Howard, P.E., by fax to (440) 934-7879 or by email to choward@bramhall-engineering.com , no later than March 17, 2023. The Village of Kelleys Island is a governmental agency, exempt from any Local, State and Federal sales taxes. Each bidder is required to furnish with its proposal a Bid Guaranty and Contract Bond in accordance with Section 153.54 of the Ohio Revised Code. Bid Security furnished in Bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said Surety. Each proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. All contractors and subcontractors involved with the project will to the extent practicable use Ohio products, materials, service and labor in the implementation of their project. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative code Chapter 123 is required. The owner intends and requires that the project be completed by no later than August 4, 2023. Bidders must comply with the prevailing wage rates on Public Improvements in Erie County, Ohio as determined by the Ohio Department of Commerce, Bureau of Wage and Hour Administration, (614) 644-2239. If the Village determines to award the contract, the Village will award it based on the lowest and best bid as determined in the discretion of the Village. The Village reserves the right to reject any and all bids and to waive any informalities or irregularities therein. Bidders must purchase bid documents to be considered an eligible bidder.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents