Similar Projects
Last Updated | 11/05/2021 02:40 AM |
Project Title | HMA overlay, replace AC surfacing and shoulder backing |
Physical Address | View project details and contacts |
City, State (County) | CA (Shasta County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,570,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 3% DVBE In Shasta County Near Viola From 3.0 Miles East Of Deer Flat Road To 0.5 Mile East Of Bridge Creek Road. 1 070030 Lead Compliance Plan Ls Lump Sum 2 090100 Time-Related Overhead (Wday) Wday 25 3 120090 Construction Area Signs Ls Lump Sum 4 120100 Traffic Control System Ls Lump Sum 5 120152 Temporary Pavement Marking (Tape) Sqft 390 6 012529 Portable Radar Speed Feedback Sign System (Ls) Ls Lump Sum 7 128652 Portable Changeable Message Sign (Ls) Ls Lump Sum 8 012530 Automated Flagger Assistance Device (Ls) Ls Lump Sum 9 130100 Job Site Management Ls Lump Sum 10 130200 Prepare Water Pollution Control Program Ls Lump Sum 11 190185 Shoulder Backing Ton 2,200 12 012531 Segment Correction Ea 7 13 390095 Replace Asphalt Concrete Surfacing Cy 470 14 390132 Hot Mix Asphalt (Type a) Ton 8,570 15 397005 Tack Coat Ton 54 16 398200 Cold Plane Asphalt Concrete Pavement Sqyd 550 17 810250 Pavement Marker (Retroreflective-Recessed) Ea 2,700 18 840515 Thermoplastic Pavement Marking Sqft 470 19 840560 Thermoplastic Traffic Stripe (Sprayable) Lf 108,000 20 846035 Remove Thermoplastic Pavement Marking Sqft 470 21 870009 Maintaining Existing Traffic Management System Elements During Construction Ls Lump Sum |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |