Similar Projects
US 176 Widening Phase I
Bidding
SC

Wappoo Road at SC Highway 61 Intersection Improvements TST
Results
Charleston, SC

Fall 2019 Resurfacing
Results
Summerville, SC

Preservation - District 6
Results

District 6 Interstate Patching
Results

Summer 2020 Resurfacing
Results
Summerville, SC 29483

Reconstruction/Rehabilitation - Berkeley County
Results
SC

Intersection Improvements - US17 A/S-48/S-97/S-40
Results
SC

Dirt to Pave of 6 Roads
Results
Less than $3,684,450 est. value
Moncks Corner, SC 29461

Repair Airfield Parking Ramp Joint Base Charleston, SC
Results
$1,000,000 to $5,000,000 est. value
Charleston, SC 29404

IDC for Asphalt Repair, Seal coating and Striping
Results
Less than $600,000 est. value
Moncks Corner, SC 29461

Widening - I-526 Clements Ferry
Results
SC

Reconstruction/Rehabilitation - District 6
Results

Asphalt Resurfacing
Results
Summerville, SC

Sangaree Parkway and Royle Road Intersection
Results
Moncks Corner, SC 29461

Last Updated 09/11/2020 04:10 AM
Project Title

Safety Improvements - US 176

Physical Address View project details and contacts
City, State (County) SC   (Berkeley County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds and Insurance 1.000 Ls Construction Stakes, Lines & Grades 1.000 Ea Large Public Sewer Relocation No. ____ 00 1.000 Ea Traffic Control 1.000 Ls Cpm Progress Schedule 1.000 Ls Clearing & Grubbing Within Roadway 1.000 Ls Removal & Disposal of Existing Asphalt Pavement 4,200.000 Sy Removal & Disposal of Existing Concrete 55.000 Cy Unclassified Excavation 4,260.000 Cy Borrow Excavation 1,230.000 Cy Maintenance Stone 100.000 Ton Hot Mix Asphalt Base Course - Type a 168.000 Ton Liquid Asphalt Binder Pg64-22 316.000 Ton Milling Existing Asphalt Pavement (Variable) 61,699.000 Sy Hot Mix Asphalt Intermediate Course Type B 63.000 Ton Hot Mix Asphalt Surface Course Type B 5,744.000 Ton Permanent Construction Signs (Ground Mounted) 656.000 Sf Pavement Markings(Temp-paint) 4" White Broken Lines 12,510.000 Lf Pavement Markings(Temp-paint) 4" Yellow Broken Lines 576.000 Lf Pavement Markings(Temporary-paint)-4" White Solid Lines 2,027.000 Lf Pavement Markings(Temporary-paint)-4" Yellow Solid Lines 7,460.000 Lf Pavement Markings(Temporary-paint)-8" White Solid Lines 6,682.000 Lf Pavement Markings(Temporary-paint)-24"White Solid Lines 4,200.000 Lf Pavement Markings (Temporary Paint) 12"X18" White Triangle Yield Bar 26.000 Lf Pavement Markings(Temporary-paint)-white Single Arrow 96.000 Ea Pavement Markings(Temp.-paint)-white Combination Arrows 4.000 Ea Pavement Markings(Temporary-paint)-white Word `only 64.000 Ea Temporary Clear Pavement Markers Mono-Dir.- 4"X4" 300.000 Ea Temporary Yellow Pavement Markers Bi-Dir.- 4"X4" 20.000 Ea 4" Yellow Broken Lines(Gaps Exc)Perm.Pvmt.Marking 288.000 Lf 6" Yellow Solid Line on Curb/median - Fast Dry Paint 4,843.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 6,255.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 1,013.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 3,341.000 Lf 12in X 18in White Triang. Yield Bar (Gaps Exc)thermo-125mil 13.000 Lf 24" White Solid Lines (Stop/diag Lines)-thermo.-125 Mil 2,100.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 48.000 Ea White Word Message "Only" -thermoplastic - 125 Mil. 32.000 Ea White Combination Arrows(Str&rt.or Str<)thermo-125mil 2.000 Ea 4" Yellow Solid Lines(Pvt.edge Lines) Thermo-90 Mil. 3,730.000 Lf Permanent Clear Pavement Markers- Mono-dir.- 4"X4" 320.000 Ea Permanent Yellow Pavement Markers Bi-dir.- 4"X4" 20.000 Ea Flat Sheet, Type Iii, Fixed Sz. & Msg. Sign 77.000 Sf Flat Sheet, Type Xi, Size Determined by Msg, Overhead 23.000 Sf F&i Mounting Assembly for F.s. Sign Erctd on Mast Arm 3.000 Ea U-section Post for Sign Supports - 3p 187.000 Lf Furnish & Install 1.0" Schedule 80 Pvc Conduit 200.000 Lf Furnish & Install 2.0" Schedule 80 Pvc Conduit 2,610.000 Lf Furnish Additional Conduit Within Directional Bore 2,725.000 Lf 4" Schedule 40 Hdpe Conduit (Trenchless) 480.000 Lf Furnish & Install 2" Schedule 80 Hdpe Conduit (Trenchless) 1,700.000 Lf Furnish & Install No. 14 Copper Wire, 4 Conductor - Black 3,890.000 Lf Furnish & Install No. 14 Copper Wire, 4 Conductor - Gray 19,170.000 Lf Furnish & Install No. 14 Copper Wire, 8 Conductor (Black) 50.000 Lf Furnish & Instl No. 14 Copper Wire,1-conductor for Loop Wire 10,424.000 Lf Sawcut for Loop Detector 4,405.000 Lf F&i-13"X24"X18"D.elec.flush Undgrd.enclos-(Str.poly.conc.)hd 52.000 Ea Furnish & Install 10` Break-away Alum Pedestal Pole and Base 10.000 Ea Furnish & Install - 12" 3 Section Signal Head 002 2.000 Ea F&i - 1-way-1sect.(Countdown Hand/man Emblem)ped.sig.head 25.000 Ea F&i-ped Push Button Micro Assembly(9"X15")and Sign(R-10-3e or R10-4a) 25.000 Ea F&i Vehicle Traffic Singal Head Mounting Assembly for Mast Arm 2.000 Ea Backplate W/ Retrorefl.borders for Traff. Sig. 5.000 Ea Removal,salvage,&disp.of Existing Traf. Signal Equipment 1.000 Ls Temporary Adjustment of Traffic Signal Equipment 1.000 Ls 15" Smooth Wall Pipe 187.000 Lf 18" Smooth Wall Pipe 134.000 Lf 24" Smooth Wall Pipe 276.000 Lf Catch Basin -type 17 5.000 Ea Manhole With Standard 4` X 4` Box 7.000 Ea Beveling of Pipe End 1.000 Ea Concrete Curb (9" X 15") 39.000 Lf Concrete Curb and Gutter(1`-6") Vertical Face 30.000 Lf Concrete Curb and Gutter(2`-0") Vertical Face 6,309.000 Lf Concrete Sidewalk(4" Uniform) 240.000 Sy Detectable Warning Material 150.000 Sf Concrete Median 1,270.000 Sy Pedestrian Ramp Construction 300.000 Sy Surface Applied Detectable Warning 30.000 Sf 6" Pipe Underdrain 5,251.000 Lf Rip-rap (Class B) 10.000 Ton Geotextile for Erosion Control Under Riprap(Class 2)type B 12.000 Sy Right of Way Marker(Rebar and Cap) 6.000 Ea Right of Way Plat 1.000 Ls Permanent Cover 0.805 Acre Temporary Cover 1.610 Acre Select Material 488.000 Cy Straw or Hay Mulch With Tackifier 2.415 Acre Fertilizer (Nitrogen) 81.000 Lb Fertilizer (Phosphoric Acid) 81.000 Lb Fertilizer (Potash) 81.000 Lb Agricultural Granular Lime 1,610.000 Lb Selective Watering 54,300.000 Gal Mowing 4.830 Acre Temporary Erosion Control Blanket (Ecb) 0.755 Msy Hydraulic Erosion Control Product (Hecp) - Type 3 0.300 Acre Inlet Structure Filter - Type F (Weighted) 830.000 Lf Inlet Structure Filter- Type F (Non-weighted) 50.000 Lf Sediment Tubes for Ditch Checks 60.000 Lf Silt Fence 2,000.000 Lf Replace/repair Silt Fence 200.000 Lf Removal of Silt Retained by Silt Fence 500.000 Lf Cleaning Inlet Structure Filters 62.000 Ea Stabilized Construction Entrance 550.000 Sy

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents