Similar Projects
Road Resurfacing SPLOST VII 2022
Infrastructure
Bidding
Woodbine, GA 31569

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

On Call Unpaved Streets Maintenance Project
Post-Bid
Saint Marys, GA

Southern Region Disaster Recovery Support BPA
Results

Construction of Keith Dixon Way
Results
Kingsland, GA 31548

T32 - District 5 Routine Maintenance Services
Infrastructure
Post-Bid
Baconton, Evans, GA 30809

St. Marys FY 2020 LMIG Project
Results
Saint Marys, GA 31558

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Roadway Improvements Field Creek Circle
Results
Woodbine, GA 31569

Pavement Evaluation Study
Alteration
Post-Bid
Saint Marys, GA

Asphalt Resurfacing LMIG 2020
Results
Less than $235,543 est. value
Kingsland, GA 31548

Roadway Improvements Planation Point Phase II
Results
Woodbine, GA 31569

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

LMIG Street Resurfacing
Results
College Park, GA 30337

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

Last Updated 03/03/2022 11:44 AM
Project Title

David L Rainer Elementary School Storage Lanes

Physical Address View project details and contacts
City, State (County) Kingsland, GA 31548   (Camden County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $115,266
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the following generally described work: Provide all labor, materials, equipment, incidentals and appurtenances to reconstruct approximately 2500 SY of graded aggregate base and pavement to provide an additional 1500 LF of vehicle storage for student drop off and pick up. Construction includes removal of 120 SY of existing base and pavement and construction of a 12 FT wide storage lane from Keith Dixon Way to the existing storage lane near Southeast Community Church. Construction also includes miscellaneous grading, erosion and sediment control, striping and testing.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents