Similar Projects
Sewer Replacement for Tri-Park's Mobile Home Community
Alteration
Design
Brattleboro, VT

Cul-De-Sac Stormwater Systems
Infrastructure
Bidding
$250,000 to $500,000 est. value
Essex, VT 05452

RFP Design - Stormwater Treatment System Final Design
Infrastructure
Bidding
$700,000 est. value
VT

Mountainside Condominiums Drainage Improvements
Renovation
Post-Bid
Warren, VT 05674

Stormwater Maintenance Program Pipe Lining 2021
Post-Bid
Colchester, VT

GSI/CSO - South End Retrofits
Results

GSI/CSO - South End Retrofits
Results

GSI/CSO: South End Retrofits
Post-Bid
Burlington, VT

Stormwater Reduction in the Town of Brandon (Neshobe River Watershed)
Results
$36,800 est. value
Brandon, VT

Rochester Town Garage - Stormwater Infrastructure Improvements
Infrastructure
Post-Bid
Rochester, VT 05767

Colchester Police Station Outfall Repair
Results
$44,000 est. value
Colchester, VT 05446

Grove Street at Mineral Street Storm Drain Improvements
Infrastructure
Post-Bid
$62,000 est. value
Springfield, VT 05156

Recreation Area Stormwater Improvements
Infrastructure
Results
$135,600 est. value
Barre, VT 05641

South Main, North Main, and Gates Street Utility and Roadway Improvements, Contract No. 2
Infrastructure
Post-Bid
$1,926,000 est. value
Hartford, VT 05001

Bog Road
Infrastructure
Results
Belvidere, VT

Reported 04/12/2022 12:00 AM
Project Title

Stormwater Pond Maintenance/Brush Hogging

Physical Address View project details and contacts
City, State (County) Williston, VT 05495   (Chittenden County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work will include the mowing or brush hogging, and removal of any small trees that may have established themselves in areas where they are not required or wanted. Any tree removal will be at the direction of the Stormwater Coordinator for Williston. The degree of slope and area of the ponds varies from site to site. All vegetation to be mowed to no less than 3” and no higher than 5”. Any debris that enter Forebays or ponds as a result of the cutting are to be removed by contractor.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents