Similar Projects
Small Structure Replacement - SR 124
Demolition, New Construction, Infrastructure
Conception
$4,228,148 CJ est. value
Warren, IN 46792

Small Structure Replacement - SR 124
Demolition, New Construction, Infrastructure
Conception
$4,228,148 CJ est. value
Warren, IN 46792

North Water Treatment Plant Backwash Pipe Lining
Infrastructure
Design
$300,000 CJ est. value
Huntington, IN 46750

2021 Huntington County Community Crossing
Post-Bid
Huntington, IN

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022 Street and Alley Paving
Infrastructure
Results
Huntington, IN

Pavement Patching
Infrastructure
Results
IN

2021 Street Paving
Infrastructure
Post-Bid
Huntington, IN

Pavement Patching - SR 3
Infrastructure
Results
IN

Huntington County Community Crossing Project
Infrastructure
Post-Bid
$140,000 est. value
Huntington, IN

County Road 200 North Roadway Improvements
Infrastructure
Results
$500,000 est. value
Huntington, IN

Tipton Street Road Rehabilitation
Infrastructure
Post-Bid
$700,000 est. value
Huntington, IN 46750

LTCP Projects 7 and 8 Northside Interceptor Sewer
Infrastructure
Results
$400,000 CJ est. value
Huntington, IN 46750

Building Demolition Project - 2201 North Jefferson Street
Demolition, Infrastructure
Post-Bid
$200,000 CJ est. value
Huntington, IN 46750

Bridge Rehabilitation or Repair
Infrastructure
Results
$2,923,308 CJ est. value
Huntington, IN 46750

Last Updated 04/28/2023 04:15 PM
Project Title

Pavement Patching - SR 218

Physical Address View project details and contacts
City, State (County) Warren, IN 46792   (Huntington County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $568,894 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contract R -44322-A Project Control No. 2200207 Federal/State No. 220020700ST2 Huntington County - on Sr 218 From Sr 9 to Sr 5 (Rp 047+0026 to 052+0082) An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid. A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Electronically does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor's employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Prequalification Engineer by the time set for receipt of proposal bids. INDOT -Call 441 - Pavement Patching - SR 218

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents