Similar Projects
BLM Northwest Oregon District Quartzville Access Road Culvert Replacement and Road Repair
Infrastructure
Design
$1,000,000 to $5,000,000 est. value
Foster, OR 97345

Albany Helping Hands
Addition, Demolition, Build-out, Infrastructure - 1,716 SF
Design
$400,000 CJ est. value
Albany, OR 97322

Albany Train Station Restroom
New Construction, Infrastructure - 276 SF
Bidding
$300,000 CJ est. value
Albany, OR 97321

Panda Express / Lebanon
New Construction, Infrastructure - 2,615 SF
Bidding
$1,500,000 CJ est. value
Lebanon, OR 97355

Westside Sewer Interceptor Project
Infrastructure
Post-Bid
Lebanon, OR 97355

Monroe Street Rehabilitation
Infrastructure
Post-Bid
$355,000 to $375,000 est. value
Harrisburg, OR 97446

US20: 53Road Avenue - East of 60th Avenue (Sweet Home) Section of the Santiam Highway
Infrastructure
Results
$1,000,000 to $2,000,000 est. value
OR

OR99E - American Drive to South City Limit (Halsey) Phase 1
Infrastructure
Results
$5,000,000 to $10,000,000 est. value
Halsey, OR

Wiley Creek Assisted Living Facility
Addition, Demolition, New Construction, Infrastructure - 25,650 SF
Construction
$7,000,000 CJ est. value
Sweet Home, OR 97386

Renovate Childcare Center at Albany Main Campus - 2022 Bond - Linn-Benton Community College
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Albany, OR 97321

Update, Repair Aging Facilities - 2022 Bond - Linn-Benton Community College
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Albany, OR 97321

New Library - City of Harrisburg
New Construction, Infrastructure - 4,307 SF
Design
$1,130,000 CJ est. value
Harrisburg, OR 97446

2023 Pipe Bursting Projects
Renovation, Infrastructure
Bidding
$1,400,000 CJ est. value
Albany, OR 97321

North Albany Elementary School (NAES) and Waverly Elementary School (WES)
New Construction, Infrastructure
Post-Bid
$300,000 est. value
Albany, OR 97321

South West 2nd Avenue Overlay Project
Infrastructure
Results
$228,000 est. value
Mill City, OR 97360

Last Updated 05/15/2023 04:08 PM
Project Title

Springhill Drive Full Depth Reclamation

Physical Address View project details and contacts
City, State (County) Albany, OR 97321   (Linn County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,150,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work generally consists of furnishing all labor, equipment, materials, and supervision for the construction of a full depth reclamation (FDR) using asphalt concrete pavement placed over in-place cement treated base, adding shoulder rock, replacing culverts, and striping the roadway per these Contract Documents. Prequalification can be met by bidder submitting Oregon Department of Transportation prequalification or providing a minimum of two (2) examples of similar construction projects completed. In addition, the Contractor must provide a statement of experience for FDR with cement treated base that lists a minimum of two (2) successfully completed projects of at least 6,000 square yards. 3) The Bid Proposal must be submitted on the prescribed form and shall contain a statement by the bidder that the bid complies with the provisions of ORS 279C.800 to 279C.870, and contain a statement as to whether the bidder is a resident bidder as defined in ORS 279A.120. 4) The Contractor must be registered with the Oregon Construction Contractors Board and shall have the appropriate license necessary to perform the work under this bid, or the State Landscape Contractors Board in order for his/her bid to be considered on construction contracts. 5) The Bid Proposal must be accompanied by cash, cashier's check, certified check or bid bond payable to Benton County, Corvallis, Oregon, in an amount not less than ten percent (10%) of the total bid amount 6) The CONTRACTOR shall, within two working hours of the date and time of the deadline when the bids are due to the COUNTY, submit to the COUNTY a disclosure of any first-tier subcontractor that will be furnishing labor or materials in connection with the public improvement and whose contract value is equal to or greater than: a) Five percent of the total project bid or $15,000, whichever is larger; or b) $350,000, regardless of the percentage of the total project bid. The disclosure of first-tier subcontractors shall include: a) The name and address of each subcontractor; b) The registration number assigned to the subcontractor by the Oregon Construction Contractors Board if the subcontractor is required to have a certificate of registration issued by the board; c) The category of work that each subcontractor will perform; and the amount of the contract of the subcontractor.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents