Similar Projects
Assembly Row Laboratory and Office
New Construction - 599,500 SF
Conception
Somerville, MA 02145

Phosphorex cGMP Manufacturing Facility
New Construction, Infrastructure - 30,000 SF
Conception
$3,500,000 CJ est. value
Hopkinton, MA 01748

Riverside Labs
Renovation - 900,000 SF
Design
Weston, MA 02493

Assured Testing Labs
New Construction, Renovation - 10,840 SF
Design
Tyngsborough, MA 01879

Raymond Road Water Treatment Plant
Renovation
Bidding
$3,500,000 CJ est. value
Sudbury, MA 01776

Renovations and Equipment Upgrades to the Main Street Pump Station - GC
Renovation
Bidding
$16,400,000 CJ est. value
Hudson, MA 01749

Renovations and Equipment Upgrades to the Main Street Pump Station - Sub Bid
Renovation
Sub-Bidding
$16,400,000 CJ est. value
Hudson, MA 01749

Well 4 Water Treatment Plant Upgrades - Phase 2 - Sub Bid
Renovation, Infrastructure
Sub-Bidding
$4,000,000 CJ est. value
Maynard, MA 01754

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

IDIQ MATOC for Healthcare and Medical Research Laboratory Facility Design Build Construction, In Support of The Defense Health Agency (DHA) Sustainment, Restoration and Modernization Program
New Construction
Post-Bid

Repairs to Wastewater Treatment Plant RBCs
Renovation
Results
$80,000 est. value
Maynard, MA

Instructional Laboratory Renovations, Ball, Olney and Southwick Halls - General Bids
Renovation
Results
$470,000 est. value
Lowell, MA 01854

New Compound Semiconductor Lab/Microsystem Integration Facility (CSL/MIF)
Demolition, New Construction, Infrastructure - 160,000 SF
Construction
$276,858,491 CJ est. value
Hanscom AFB, MA 01731

Life Sciences Center
New Construction - 35,883 SF
Construction
$60,000,000 est. value
Waltham, MA 02453

28 Fitchburg Redevelopment
New Construction - 199,200 SF
Pending Verification
$10,000,000 CJ est. value
Somerville, MA 02143

Last Updated 09/21/2022 08:51 AM
Project Title

HVAC Automation and Replacement Deer Island Waste Water Treatment Plant-General

Physical Address View project details and contacts
City, State (County) Sudbury, MA 01776   (Middlesex County)
Category(s) Laboratory, Sewer and Water
Sub-Category(s) Laboratory, Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $71,562,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 26, 2022, bids are still pending. Once they've been awarded general contractor bids will be finalized. A construction timeline is unknown at this time.** * The general contractor will pick who they are carrying for the sub-bid work. The replacement of existing heating, ventilation, and air conditioning equipment; building automation systems; fume hood equipment; and related appurtenant and incidental work at the Deer Island Treatment Plant. Contractor Category: HVAC Allow Electronic Quote: No This contract is subject to a 7.24 % MBE and a 3.6 % WBE participation requirement. Q&A Close date : 11/19/2018

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents