Similar Projects
West Hill Sewer Separation Project (5C) - City of Muscatine
Infrastructure
Conception
$3,000,000 CJ est. value
Muscatine, IA 52761

Papoose Lift Station Force Main Redundant Line - City of Muscatine
Infrastructure
Conception
$900,000 CJ est. value
Muscatine, IA 52761

West Hill Area Sanitary and Storm Sewer Separation - Phase 6A and 6B
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Muscatine, IA 52761

New Wash Bay Facility
New Construction, Infrastructure
Post-Bid
$350,000 CJ est. value
Muscatine, IA 52761

Career Technical Education Building - Bid Package 6
Infrastructure, Alteration
Results
$200,000 est. value
Muscatine, IA 52761

67th Avenue Sidewalk Improvements
Infrastructure
Results
$292,982 CJ est. value
Muscatine, IA 52761

West Liberty Food / West Liberty
New Construction, Infrastructure - 200,000 SF
Pending Verification
$150,000,000 CJ est. value
West Liberty, IA 52776

Kent Pet Manufacturing Facility
New Construction, Infrastructure - 113,000 SF
Pending Verification
$80,000,000 CJ est. value
Muscatine, IA 52761

Fuller Park Erosion Control - City of Muscatine
Infrastructure
Conception
$300,000 CJ est. value
Muscatine, IA 52761

Construction of a NEW West Liberty Athletic Complex Mass Grading & Site Utilities
Infrastructure
Post-Bid
$500,000 CJ est. value
West Liberty, IA 52776

Fairport Fisheries - Pavalion Pavement and Parking Area (Rebid)
Infrastructure
Results
$24,972 CJ est. value
Muscatine, IA 52761

Greenwood Cemetary Erosion Control - City of Muscatine
Infrastructure
Conception
$1,000,000 CJ est. value
Muscatine, IA 52761

Central Production Kitchen Project
New Construction, Infrastructure
Post-Bid
$850,000 CJ est. value
Muscatine, IA 52761

Construction of Rainbow Drive and Maxson Avenue Roadway Improvements Project
Infrastructure
Results
$1,447,930 CJ est. value
West Liberty, IA 52776

Heinz Sewer Reconstruction Project - City of Muscatine
Infrastructure
Conception
$725,000 CJ est. value
Muscatine, IA 52761

Last Updated 06/12/2023 09:05 AM
Project Title

Muscatine County Conservation Maintenance Facility

Physical Address View project details and contacts
City, State (County) Muscatine, IA 52761   (Muscatine County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Military Facility, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $386,500 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed consists of site preparation and construction of a new engineered post frame structure with partially finished and conditioned office/shop space and unconditioned storage space. Site work includes installation of a waste water holding tank, utility connection and installation of new hard surface drives and walks. The new construction work of this project included site preparation, wastewater holding tank installation, electrical utility connection, concrete footings and foundations, engineered post frame structure with steel exterior wall panels and roofs, steel trims, gutters and downspouts, insulated steel doors, insulated sectional overhead doors, aluminum framed glazing, interior wood framing, drywall installation and finish, interior painting, ACT ceiling installation, electrical to include lights, power and low voltage/data, interior plumbing and fixtures for single user restroom and split system HVAC for office and shop spaces. Bid Security shall be made payable to Muscatine County Conservation, in the amount of 10 percent (10%) of the Base Bid sum. Security shall be CERTIFIED CHECK, BANK CASHIERS CHECK or AIA A310 BID BOND issued by the Surety licensed to conduct business in the state in which the Project is being constructed. The Owner reserves the right to approve the sufficiency of the required bid security. The successful bidder’s Security will be retained until it has signed the Contract and furnished the required PAYMENT and PERFORMANCE BONDS. The Owner reserves the right to retain the Security of the next three (3) lowest bidders until the lowest Bidder enters into a Contract or until sixty (60) days after bid opening, whichever is the shorter. All other Bid Security will be returned as soon as practical. If any Bidder refuses to enter into a Contract, the Owner will retain its Bid Security as liquidated damages, but not as a penalty.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents