Similar Projects
FLD H SW Chiller Plant - Add Chiller - Phase 9
Renovation
Sub-Bidding
$1,275,000 CJ est. value
Salt Lake City, UT 84112

Replace Chillers
Term Contract
Post-Bid
Salt Lake City, UT 84116

SD 100/160 HVAC Overhaul Kits
Alteration
Post-Bid
Salt Lake City, UT

Chiller Replacement Jefferson Jr. High School
Results
Kearns, UT 84118

Health Science Campus High Temp Water Line Removal
Results
$1,140,000 est. value
Salt Lake City, UT 84112

Canterbury Furnaces
Alteration
Post-Bid
Salt Lake City, UT

J041--660 - (S4) ** EMERGENT** Air Handler Repair Bldg 2 AHU Repairs
Term Contract
Results
Salt Lake City, UT 84148

Salt Lake City ATCT CRAC Unit Upgrades
Term Contract
Post-Bid
Salt Lake City, UT

Westpointe Student Support Building Roof and Rooftop Mechanical Replacement
Alteration
Results
$950,000 est. value
Salt Lake City, UT 84116

HVAC Generation 4/5 LG VRF System Service/Maintenance
Alteration
Post-Bid
Salt Lake City, UT

Air Terminal Upgrade
Alteration
Results
UT

Airport Operations Center HVAC
Alteration
Post-Bid
Salt Lake City, UT 84122

Jewelry Room Ventilation
Term Contract
Results
Herriman, UT 84096

University Of Utah Generator And Switches
Term Contract
Post-Bid
Salt Lake City, UT 84112

HTW: Replace Expansion Tanks And Add Dearator
Term Contract
Results
$4,445,362 est. value
Salt Lake City, UT 84129

Last Updated 11/02/2022 06:31 PM
Project Title

HVAC Controls Upgrade Fox Hills Elementary School

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84118   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,890,971 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Fox Hills Elementary School - HVAC Controls Upgrade 3775 WEST VIXEN WAY (6020 SOUTH) TAYLORSVILLE, UT 84129 All questions related to the project must be submitted to U3P (Utah Public Procurement Place) the bid service used by Granite School District. Based on the mutually agreed upon program, or scope of work, schedule and construction budget requirements, the DESIGNER shall prepare, for written approval by GSD, Schematic Design Documents consisting of drawings and other documents illustrating the scale and relationship of Project components. b) The Schematic Design Documentsshall comply with this Agreement and the Design Standards. c) The Schematic Design narrative shall include the DESIGNER's proposed design and construction budget which shall be within the GSD budget provided to the DESIGNER. The school's existing HVAC controls system is a hybrid of electronic and pneumatic components. The plans and specifications denote the existing HVAC controls configuration. A brief overview and intent of HVAC Controls Upgrade project is to complete the following: a. Replace all pneumatically controlled devices with electronic DDC components, and integrate them into the school's existing Building Automation System (BAS). b. Upgrade the school building's Ventilation & Filtration system as outlined in the plans and specifications

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents