Similar Projects
MRI Chiller Preventive and Corrective Maintenance, NMCSD, MCAS Miramar
Term Contract
Sub-Bidding
San Diego, CA 92134

J041--Repair/Refurbish AC Units 15, 16 & 19
Renovation
Sub-Bidding
$250,000 CJ est. value
San Diego, CA 92161

HVAC - Chula Vista Veterans Home
Renovation
Post-Bid
$200,000 CJ est. value
Chula Vista, CA 91911

HVAC Maintenance IWA
Alteration
Post-Bid
CA

SDIA- Airport Administration Building - HVAC
Alteration
Results
San Diego, CA 92101

HVAC Installation at Mendoza and Nicoloff Elementary
Alteration
Results
$645,000 est. value
San Diego, CA 92154

REPAIR/REFURBISH/PMI AC Units-3&4 Request for Quote
Renovation
Sub-Bidding
$250,000 CJ est. value
San Diego, CA 92161

Preventive Maintenance and As-Needed Repair Services for Ventilators
Alteration
Post-Bid
San Diego, CA

New Cooling Tower
Alteration
Results
$200,000 est. value
Poway, CA 92064

HVAC Systems Full Service and Repair
Alteration
Post-Bid
San Diego, CA

Police Pistol Range HVAC and Safety Improvements
Renovation - 48,260 SF
Results
$3,624,111 CJ est. value
National City, CA 91950

Surge Tents With HVAC Systems
Alteration
Post-Bid
San Diego, CA

Administration Building HVAC Replacement
Renovation
Results
$5,723,249 CJ est. value
Chula Vista, CA 91910

HVAC Preventative Maintenance and Repair Services
Alteration
Post-Bid
Solana Beach, CA

Medical Center Encinitas HVAC Replacement
Renovation
Results
$607,376 CJ est. value
Encinitas, CA 92024

Last Updated 07/13/2023 11:22 AM
Project Title

Refrigeration Unit, Walk-In Combination Cooler/Freezer Replacement

Physical Address View project details and contacts
City, State (County) San Diego, CA 92111   (San Diego County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $115,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

1.1 The Contractor shall provide services to replace the Refrigeration Unit, Walk-In, Combination Cooler/Freezer at the California Department of Corrections (CDCR) Custody to Community Transitional Reentry Program (CCTRP) located at 3050 Armstrong Street, San Diego, CA 92111. The Contractor will be compensated for the services in accordance with the service rate specified on Exhibit B-1, Public Works Rate Sheet; which shall include all labor, insurance, bonds, licenses, travel and per diem, materials, non- consumable supplies, transportation, equipment (including rental), training of key institution personnel and every other item of expense necessary to provide the services. The California Department of Corrections and Rehabilitation (CDCR), hereafter referred to as the State, is inviting responses to this Invitation For Bid (IFB) entitled "Refrigeration Unit, Walk-In Combination Cooler/Freezer Replacement" for the Custody to Community Transitional Reentry Program (CCTRP) San Diego, located at 3050 Armstrong Street, San Diego, CA 92111. Letters of Inquiry 3:00 p.m., on June 23, 2023 The State's estimate for this Agreement is $115,000.00. Termination of Agreement 365 Calendar Days from NTP Submit your letter of inquiry by the date/time specified in the Projected Timetable Section I, directly to Kathy Reyna, Contracts Management Branch, by any of the following:E-mail:Katherine.reyna@cdcr.ca.gov Inquiries received after this date will only be addressed at CDCR's discretion. Refrigeration Unit, Walk-In, Combination Cooler/Freezer Lot to include, but not limited to: A. Cam lock style insulated panels B. Cooler and freezer door replacement with all associated hardware. Flush mounted, self- closing with magnetic gasket. The cooler shall include a view window. C. All interior finishes and exterior finishes of cooler and freezer box shall be as follows: 1. Interior wall finish: Stainless Steel 2. Interior ceiling finish: Stainless Steel 3. Exterior unexposed finish: Embossed galv. 4. Exterior exposed finish: Stainless Steel D. Insulation: 4" Foamed in place polyurethane E. All lighting (LED), sprinklers, light switches, digital thermometer and heated pressure port in freezer. 1. Remote refrigeration system with smart controls for cooler and freezer 2. All mechanical and electrical equipment necessary for refrigeration equipment. F. All line sets necessary for mechanical equipment 1. Freezer to include prefab 4" insulated 18 GA Sani Steel slip resistant floor. 2. The existing tile shall be removed. 3. Refrigerator shall include the removal and replacement of all damaged floor tile. 4. Refrigeration: A. Cooler: (1) 1-1/4 HP medium temp. R-448 Condensing unit with balancing evaporator 208/230/1 B. Freezer: (1) 2 HP low temp. R-448a condensing unit with balancing evaporator 208/230/1 3.2 All condensing units shall be provided with pressure controls, timer, sight glass and dryer. (All factory installed and shipped under pressure). A. All evaporator coils are to be provided with expansion valves, solenoids and thermostat. All factory installed and shipped under pressure must meet all California Energy Commission and Environmental Protection Agency (EPA), Air Quality Management District (AQMD) Regulations as of January 1, 2021 and Department of Industrial Relations requirements per Senate Bill 854. 3.3 The Contractor shall: A. Demolish and remove existing equipment. B. Disconnect electrical, refrigeration and drains from existing walk-in box. C. Demolish existing walk-in box, haul away and dispose of as per EPA/AQMD requirements. D. Be responsible for the delivery and installation of the new combination cooler/freezer and associated equipment. E. Be responsible for the electrical hook-up of unit and the compressor. F. Install and hook-up condensate lines and cooling lines between refrigerator and freezer. G. Must include all necessary permits, including State Fire Marshal permits.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents