Similar Projects
Heating Ventilation and Air Conditioning (HVAC) Maintenance Services
Term Contract
Sub-Bidding
Kansas City, MO 64106

HVAC Services - Atherton Wastewater Plant
Term Contract
Sub-Bidding
Independence, MO 64058

Roof Top Units Replacements Bid Group 1
Alteration
Post-Bid
Blue Springs, Lees Summit, MO 64015

Roof Top Units Replacements Bid Group 2
Alteration
Post-Bid
Blue Springs, Lees Summit, MO 64015

KCPS Franklin Elementary - Coolers
Alteration
Results
MO 64109

HVAC Control System Replacement at Vesper Hall
Alteration
Results
Blue Springs, MO 64014

2023 HVAC Preventative Maintenance/Services
Term Contract
Sub-Bidding
Grain Valley, MO 64029

Roof Top Units Replacements Bid Group 3
Alteration
Post-Bid
Blue Springs, Lees Summit, MO 64015

Water Plant Lime Bind Dust Collector Replacement
Alteration
Results
Sugar Creek, MO 64058

HVAC Equipment Retrofits 2022
Alteration
Post-Bid
Independence, MO 64055

HVAC Replacement
Alteration
Results
Independence, MO 64052

HVAC Maintenance, Inspection, and Repair Services
Alteration
Post-Bid
Lees Summit, MO 64064

Community Action Agency of Greater Kansas City Low Income Weatherization Assistance Program
Renovation
Results
$323,450 CJ est. value
Kansas City, MO 64106

Nowlin Middle School Auxiliary Gym And Locker Rooms HVAC
Renovation, Alteration
Post-Bid
Independence, MO 64052

Independence School District HVAC Equipment Retrofits
Renovation, Alteration
Post-Bid
Independence, MO 64055

Last Updated 02/20/2023 03:08 PM
Project Title

2023 Summer HVAC

Physical Address View project details and contacts
City, State (County) Kansas City, MO 64106   (Jackson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $437,684 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Package 1 - Lippert - $ 104,088.00 Package 2 - Service Plus - $ 107,941.00 Package 3 - Lippert - $ 225,655.00 The Park Hill School District (DISTRICT) is seeking proposals from qualified providers (CONTRACTOR) to furnish labor and materials for removal and installation of HVAC units. Bid results will be posted on the DISTRICT web site on February 25th. Said proposals must conform to the specifications and instructions. Proposals must be returned on the form(s) provided, with "Bid Proposal - 2023 Summer HVAC" clearly on the label. A proposal must consist of all pages of the proposal request including the signature page of the proposal, signed by an authorized representative of the firm. Non-conformance with these instructions may be grounds for rejection of proposal. The DISTRICT reserves the right to reject any and all proposals and to waive informalities.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents