Similar Projects
Wastewater Treatment Plant and Associated Appurtenances
Design
FL

Water Reclamation Facility Expansion
Addition
Design
Clermont, FL

Wastewater Treatment Plant No. 2 Expansion
Addition - 210,476 SF
Bidding
$15,000,000 to $18,000,000 est. value
Palm Coast, FL

Domestic Water Plant Maintenance Services
Renovation, Term Contract
Bidding
Sarasota, FL

Mid-County Waste Water Treatment Plant Headworks
New Construction
Post-Bid
$5,000,000 est. value
Dunedin, FL 34698

Bradenton Water Treatment Plant (WTP) Drying Lagoon
Post-Bid
Bradenton, FL 34203

Tindall Hammock Irrigation and Soil Conservation District Water Treatment Plant Improvements Phase 2
Term Contract
Results
Less than $572,000 est. value
Davie, FL 33314

HFC AWTP Master Plan Improvements, Phase I Design-Build
Results
Less than $254,000,000 est. value
Tampa, FL 33602

CR 136 / I-75 Water Treatment Plant
Construction
FL

Packing District Park - Master Lift Station Upgrades
Renovation
Construction
Orlando, FL 32869

Spencer's Crossing Water Treatment Facility (WWTF) Clarifier No. 1 Foundation Stabilization
Renovation
Bidding
Orange Park, FL 32065

J046--Fy20: RFI Water Treatment Boiler and Chiller
Post-Bid
Tampa, FL 33612

Design-Build Services for DLTWTF Master Plan Improvements
Results
Less than $300,000,000 est. value
Tampa, FL 33600

Water Treatment Plant Operations Building Reconstruction and Remodel
Construction
Less than $2,400,000 est. value
Panama City, FL 32404

Construction Services for the McDuff WTP Refurbishment Project and Norwood WTP Refurbishment Project
Renovation
Bidding
Jacksonville, FL 32205

Reported 11/30/2021 09:52 AM
Project Title

WTP No. 1 and WTP No. 2 Improvements Project

Physical Address View project details and contacts
City, State (County) Haines City, FL 33844   (Polk County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method
Project Status Permitting, Construction Start Expected first quarter 2022, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $4,023,800
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To standardize equipment at both water treatment plants. Newly installed equipment at WTP No. 1 will serve as the basis of improvements at WTP No. 2. In addition, the project includes new GST installation at WTP No. 1. WTP No. 1 Improvements: 1. Construct new 500,000 gallons Ground Storage Tank (GST) with safety hand rails, stairs and walkway to GST No.1-1 and GST No. 1-2. Furnish and install two (2) mixers in the new GST. 2. Furnish and install new bulk storage area with two (2) (3,000 gallons each) dual lined chlorine feed tanks. Demolish existing two (2) bulk chlorine tanks, refurbish existing chlorine storage area and remove overhead hoist beam. 3. Grade the site and relocate stormwater pipe. 4. Mill and resurface receiving area roadway. WTP No. 2 Improvements: 1. Furnish and install above ground raw water chemical injection (Fluoride, Corrosion Inhibitor and Pre-Chlorine) and flow meter assembly. Demolish existing underground vault. Furnish and install Chlorine/Fluoride/pH/ Temperature/Conductivity analyzer. 2. Furnish and install Fluoride and Corrosion Inhibitor storage area with two (2) (360 gallons each) duel lined chemical feed tanks. Demolish existing Fluoride building. 3. Furnish and install above ground finished water chemical injection (Post-Chlorine) and flow meter assembly. 4. Demolish existing post chlorine injection vault. 5. Furnish and install GST mixers in GST No. 2-1 and GST No. 2-2 (two (2) mixers in each GST). 6. Furnish and install safety hand rails, stairs for both GSTs and a walkway between GST No. 2-1 and GST No. 2-2. 7. Mill and resurface receiving area roadway

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans