Similar Projects
FY21 Dock Repair - Apostle Islands National Lakeshore
Design
$500,000 to $1,000,000 est. value
Bayfield, WI

Z--35234 - St. Croix Shores Boathouse - Stairs Project
Design
$500,000 to $1,000,000 est. value
Saint Croix Falls, WI 54024

Boat Launch Improvements
Bidding
$475,000 est. value
Fountain City, WI 54629

126' Aluminum Truss Dock
Post-Bid
Scandinavia, WI 54977

Seasonal Removal and Installation of Dock
Post-Bid
De Soto, WI 54624

Boat Launch Repair
Results
Less than $360,000 est. value
Madison, WI 53703

Cotton Mill Park Fishing Platforms and Kayak Launch
Addition
Results
Beaver Dam, WI 53916

Pewaukee Lake Boat Launch Reconstruction
Post-Bid
Pewaukee, WI 53072

Courtesy Dock and Ramp
Results
Prescott, WI 54021

Fountain City Service Base Phase II Design Build
Post-Bid
Fountain City, WI

Instrumentation for Prestressing Miter Gate Diagonals - Lock & Dam 4
Results
Alma, WI 54610

Boat Landing Improvements
Post-Bid
Wauzeka, WI

Pine Lake Boat Launch Access Improvements
Results
Chenequa, WI

Saint Croix Shores Boathouse - Stairs Project
Post-Bid
$500,000 to $1,000,000 est. value
Saint Croix Falls, WI 54024

Pier 1 Water and Decking
Results
Washburn, WI 54891

Reported 03/25/2020 12:00 AM
Project Title

J--Dock Repair

Physical Address View project details and contacts
City, State (County) Bayfield, WI   (Bayfield County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: The National Park Service is seeking a potential contractor to provide all labor, supervision, and all other resources to facilitate the repairs to the Sand Island East (SAEB) Bay Dock. The SAEB dock was constructed in 2016 with a gapped steel crib structure design to allow the transport of sediment through the structure. The steel cribs were filled with improper granular material and as a result a portion of the dock failed over the 2018-2019 winter and spring.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents