Similar Projects
Last Updated | 09/14/2022 03:08 PM |
Project Title | F. E. Weymouth Water Treatment Plant Basins 5-8 and Filter Building No. 2 Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | La Verne, CA 91750 (Los Angeles County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected June 2022 |
Bids Due | View project details and contacts |
Estimated Value | $79,897,020 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists of replacing of flocculation/sedimentation equipment at Basin Nos. 5-8 including pumps, inlet gates, flocculator motors/variable frequency drives, gear reducers, drive trains, shafting/arms/couplings, bearing housing and liner, paddle wheel boards, baffle wall boards and supports, clarifier turntable assemblies, clarifier access bridges, clarifier motor/integral gearboxes, work gearboxes and pinions, rakes and launders and basin auxiliary systems; replacing of Basins Nos. 1-4 inlet gates, actuators and associated equipment; structural modifications and concrete reinforcement of basin walls and basin inlet channel; filling interior basin corners with sloping concrete fillets; replacing 127 butterfly valves and their actuators with Metropolitan-furnished equipment; replacing or modification of structural support components of equipment, piping, mechanical, electrical/control equipment, access hatches, handrails, and lights; performing hazardous material abatement; and other appurtenant work as specified and shown on the drawings. License Requirements A Estimated Bid Value $65,000,000 to $80,000,000 Q and A Deadline 03/10/2022 11:59 PM Questions regarding this project shall be emailed to SpecsDesk@mwdh2o.com. For this project, Metropolitan requires small and/or disabled veteran business participation of at least 25 percent of the total bid. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Note from Shimmick Construction: Subcontractors with packages over $200,000 must submit document 00485 Sexual Harrassment & Abusive Conduct Prevention Training Certification form RSVP is required in order for Metropolitan to make accommodations for maintaining social distancing. Attendees shall bring a hard copy of the "Prospective Bidder COVID 19 Self-Health Review / Safety Requirements" form to the pre-bid meeting and provide it to Metropolitan's representative. Addendum #1-#6 have been issued as of 4-6-2022. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |