Similar Projects
Lansdowne Avenue Pedestrian Crossing
Results
Lansdowne, PA 19050

Darby Road Streetscape - Phase II
Results
Havertown, PA 19083

Ferne Boulevard Streetscape Improvements
Results
Upper Darby, PA 19082

2nd Ward Playground Sidewalk and Curb Remediation
Results
Upper Darby, PA

Media Borough Sidewalk Maintenance
Results
$50,000 est. value
Media, PA 19063

2020 CDBG Resurfacing of Various Streets
Results
Upper Darby, PA 19082

Ordinary Street and Sewer Maintenance
Results
Darby, East Lansdowne, Yeadon, PA 19050

Radnor Township Trail - Design Activities Limited to: ADA Curb Ramps
Results
$1,000,000 to $2,499,999 est. value
PA

Route 1 and Route 82 Intersection Improvements Project
Results
$500,000 to $1,000,000 est. value
Chadds Ford, PA

FY 2019 CDBG Project Glenolden Park Walking Path
Results
Glenolden, PA

North Wayne Avenue SR 1046 & Eagle Road ADA Ramp Installation, Push Buttons, Hand/Man Countdown, Crosswwalks
Results
Wayne, PA 19087

Wallingford Mass Transit: Design-Build Activities limited to ADA Ramps
Infrastructure
Results
$500,000 to $999,999 est. value
PA

Penncrest High School Parking Improvements
Infrastructure
Results
Media, PA 19063

Llanerch Park - ADA Pedestrian Access
Infrastructure
Results
$20,000 to $30,000 est. value
Havertown, PA 19083

Baltimore Pike and Applied Bank Boulevard/State Farm Drive Sidewalk and Pedestrian Improvements
Infrastructure
Results
Glen Mills, PA 19342

Last Updated 01/04/2022 12:26 PM
Project Title

Installation of a Pedestrian Sidewalk Along West Wayne Avenue

Physical Address View project details and contacts
City, State (County) Wayne, PA 19087   (Delaware County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of a pedestrian sidewalk along W Wayne Ave. with the installation of ADA Ramps, Driveway Adjustments, Full Depth Curb Replacement along W. Wayne Ave., Concrete Driveway Aprons, and other associated work.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents