Similar Projects
Newman Road Culvert Replacement
Bidding
Less than $150,000 est. value
Pennsburg, PA 18073

Simmons Elementary School Pool Filtration, Chlorination, and Drainage Upgrades
Post-Bid
Horsham, PA 19044

Meadow Brook - Flood Control
Results
Less than $6,210,000 est. value
Meadowbrook, PA

Schultz Road Culvert Replacement
Results
$90,000 est. value
Tylersport, PA 18971

Balligomingo and Brandywine Creek Road Slide Restoration
Results
$5,000,000 to $7,499,999 est. value
PA

Wissahickon Creek Stabilization and Enhancement
Results
$250,000 est. value
Blue Bell, PA 19422

Summit Drive Culvert Replacement
Results
Upper Providence, PA

Fennel Road Culvert Project
Results
Less than $150,000 est. value
PA

Rowland Community Center Wall
Results
Cheltenham, PA 19012

Defford/Clyston Roads Retrofit Basin
Results
$40,000 est. value
Worcester, PA 19490

Knox Basin Improvements
Results
$190,000 to $195,000 est. value
Ardmore, PA 19003

Sinkhole Repairs
Results

Growing Greener 2016 Project - Stormwater Management BMP Control Measures Roychester Park - Evergreen Manor Park
Results
Less than $180,000 est. value
Abington, PA 19001

2019-2021 UMT Emergency Sinkhole Repair Contract
Results
King of Prussia, PA

Spring House Roadway Improvements Project Phase 1 - Sumneytown Pike Culvert Extension
Results
$700,000 to $800,000 est. value
Spring House, PA 19477

Last Updated 12/03/2018 04:04 PM
Project Title

Area B Streambank Stabilization

Physical Address View project details and contacts
City, State (County) PA   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $75,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The work to be done under this contract consists of all labor, equipment and materials to fully construct the streambank restoration-stabilization to protect the existing sanitary manholes and pipes at three (3) locations as shown on the Drawings and as described in the Project Manual. The work includes soil erosion and sediment control measures, restoration of disturbed areas, traffic control, and videotaping of existing conditions prior to construction. All work is to be completed in strict accordance with the Drawings and Project Manual. Work is contained under one lump sum contract. The project is located in three (3) locations: Meetinghouse Road, Sawmill Lane, and Black Watch Court, in Horsham Township, Montgomery County, PA.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents