Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

2021 Crete Township Road District Pavement Maintenace
Infrastructure
Post-Bid
Crete, IL

Water and Sewer Lines
Infrastructure
Post-Bid
Homer Glen, IL

Filter Media at Well #10
Renovation
Results
Frankfort, IL 60423

Asphalt
Infrastructure
Results
Joliet, IL

Vetter Road Segment II Roadway Reconstruction & Realignment Drainage Improvements
Addition
Construction
Joliet, IL

Parking Lot Paving Services
Infrastructure
Post-Bid
Frankfort, IL

Ruby Street, Margaret Street and Will Center Road Water Main Improvements
Infrastructure
Results
Monee, IL

F.O.B. County Garage
Infrastructure
Post-Bid
Joliet, IL

Stony Island Avenue Pavement
Infrastructure
Results
IL

Snow Plowing Services
Infrastructure
Post-Bid
Channahon, IL

Resurfacing With Hot-Mix Asphalt Binder and Surface Courses
Infrastructure
Results
$179,076 est. value
Lockport, IL 60441

2021 Construction Projects
Infrastructure
Post-Bid
Joliet, IL

Gould Street Water Main Replacement
Infrastructure
Results
$1,100,000 est. value
Beecher, IL 60401

Last Updated 02/17/2023 05:10 AM
Project Title

248th Avenue - 95th Street to 103rd Street - SC190 - City of Naperville

Physical Address View project details and contacts
City, State (County) Naperville, IL 60564   (Will County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2026
Bids Due View project details and contacts
Estimated Value $7,175,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves upgrading 248th Avenue to minor arterial roadway standards. Improvements include the construction of new pavement and base, curb and gutter, street lighting, sidewalk and storm sewer. As February 17, 2023, this project is currently in the FY 2023 - 2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2026. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents