Similar Projects
IGT Subdivision Improvements -Water and Sewer
Infrastructure
Bidding
Rapid City, SD

Pipe Work - PCN - 04TJ
Infrastructure
Bidding

East 1st Street Extension
Post-Bid
$4,000,000 est. value
Tea, SD 57064

Replacing Existing Main Distribution Areas - Water Department and Installation of Flood Wall Berm at Pelican Sub - Electric Department
Post-Bid
Watertown, SD

Gateway Boulevard (CR106) Phase 2 Improvements
Results
Less than $14,500,000 est. value
Tea, SD 57064

2021 Douglas/Washington Streets
Results
Elk Point, SD 57025

Elkton Utility Improvements - Phase II
Infrastructure
Bidding
Elkton, SD

Main Street Streetscape
Post-Bid
Vermillion, SD

Water Meter Replacement - Phase 2
Results
Brandon, SD

2021 Water Main Replacement Installation
Post-Bid
Wessington Springs, SD 57382

Ultrasonic Meters
Results
Sioux Falls, SD

Streeter Drive Realignment
Post-Bid
$1,281,000 est. value
North Sioux City, SD

33rd Street and Minnesota Avenue Intersection Reconstruction, Utility Improvements, Pavement Repairs and ADA Improvements
Results
Less than $1,760,000 est. value
Sioux Falls, SD

Avon Main Street Reconstruction
Post-Bid
Less than $1,500,000 est. value
Avon, SD

East Watertown Street Water Main Replacement
Results
Rapid City, SD 57701

Last Updated 09/24/2021 08:31 AM
Project Title

Highway 46 Water Main Relocation

Physical Address View project details and contacts
City, State (County) Tabor, SD   (Bon Homme County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,190,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Construction and relocation of approximately 8.5 miles of 1 ½ , 2 , 3 , 4 and 6 PVC water main and services, gate valves with and without boxes, 1 ½ ball valves with boxes, 3282 feet of 2 to 6 PVC pipe installed by horizontal directional drilling, tie-ins, fittings, two pressure reducing valve installations, seeding and mulching, traffic control and other appurtenant and incidental work as more fully enumerated in the Bidding Documents.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents