Similar Projects
RFQ Design - Public Health Education Building
New Construction, Infrastructure
Bidding
$44,923,000 CJ est. value
San Antonio, TX 78224

RFP - TxDOT San Antonio District Professional Services Contract
Term Contract
Bidding
San Antonio, TX 78225

Professional Engineering Services for Preparation of Design-Bid-Build Documents and Design-Build Request for Proposals for Various Projects Types at DOD and Non-DOD Activities
New Construction, Renovation, Term Contract
Post-Bid
Less than $30,000,000 est. value

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

Steven M. Clouse Water Recycling Center (WRC) Primary and Secondary Treatment Expansion - San Antonio Water System
Addition, Demolition, Infrastructure
Pending Verification
$99,400,000 CJ est. value
San Antonio, TX 78221

RFQ Design - A and E Design Services for a Prototype Hospital for Two Separate Site Locations and Associated Projects
New Construction, Infrastructure
Bidding
$205,000 CJ est. value
San Antonio, TX 78205

AVN Environmental Services Statewide Contract w/WA
Infrastructure
Post-Bid

Multimedia Environmental Compliance Engineering Support for Navy, Marine Corps, and other DOD Installations, and Federal Agencies
Results
Norfolk, VA

RFQ Design - A and E Design Services for a Public Health Building for Two Separate Site Locations and Associated Projects
New Construction, Infrastructure
Bidding
$10,778,554 CJ est. value
San Antonio, TX 78205

On Call Engineering Services
Term Contract
Post-Bid
Somerset, TX

USPS IQ AE Environmental Southern (Area #1 & #2)
New Construction, Term Contract
Results
Washington, DC

RFQ Design - Steven M. Clouse WRC Biosolids System Upgrades
Renovation
Bidding
$50,000 CJ est. value
San Antonio, TX 78205

Professional Services for Justice Precinct 3 Renovation
Infrastructure
Post-Bid
San Antonio, TX 78207

Last Updated 06/21/2023 11:24 AM
Project Title

Silver Mountain Pump Station Upgrades

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78205   (Bexar County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Design Development, Request for Qualifications, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 21, 2023, a design engineer has been selected. A bidding and construction timeline have not been confirmed. *The previous solicitation is listed below for reference The San Antonio Water System (SAWS) is pursuing a Request for Qualifications (RFQs) for professional engineering services for the Silver Mountain Pump Station Upgrades ("Project"). Statements of Qualifications (SOQs) from interested firms (Respondents) are being accepted in connection with the project, which will require the scope of services to be performed by qualified professional engineering firms (Consultants). The selected professional engineering firm shall provide engineering services entailing engineering evaluations, studies, reports, preliminary engineering, design, bid, construction, and overall project management services for the design and construction of the Project. The services will include, but not limited to, project management and coordination, civil, structural and electrical engineering services, instrumentation and controls, surveying, permitting, subsurface utility engineering, preliminary engineering and studies, design, scheduling, cost estimating, construction management and other services as necessary for the Project. June 14, 2022 by 4:00 PM (CDT). ............................................ Receipt of Written Questions Due June 17, 2022 by 4:00 PM (CDT). ..........................................................Q & A Posted to Website July 2022..............................................................................................................SOQs Evaluated July 2022..................................................................................................Interviews (If necessary) July/August 2022.......................................................................................... Contract Negotiations September 2022...............................................................SAWS Board Consideration and Award September 2022.............................................................................. Non-Selection Notices Mailed September 2022...................................................................................... Authorization to Proceed September 2022.............................................................................................................Start Work Respondents and/or their agents may contact Marisol V. Robles, SMWVB Program Manager at 210-233-3420 for assistance or clarification with issues specifically related to the Small, Minority, Woman, and Veteran-Owned Business (SMWVB) Program policy and/or completion of the Good Faith Effort Plan. Respondents are strongly encouraged to submit their proposals at least two (2) hours prior to the Proposal deadline and time to avoid last minute transmission issues. If you believe there is an issue, please contact July 8, 2022 by 10:00 a.m., Contract Administrator at 210-233-3070 for assistance before the due date deadline a. M/WBE Scoring Method: Up to 15 Points (By percentage) 40.00% M/WBE Participation o M/WBE Participation Percentage between 1% and 7.99%: 2 Points o M/WBE Participation Percentage between 8% and 14.99%: 4 Points o M/WBE Participation Percentage between 15% and 21.99%: 6 Points o M/WBE Participation Percentage between 22% and 28.99%: 8 Points o M/WBE Participation Percentage between 29% and 34.99%: 10 Points o M/WBE Participation Percentage between 35% and 39.99%: 12 Points o M/WBE Participation Percentage meeting or exceeding 40.00%: 15 Points b. SBE (Non-M/WBE) Scoring Method: Up to 5 Points (By percentage) 5.00% SBE Participation o SBE Participation Percentage between 1% and 1.99%: 1 Point o SBE Participation Percentage between 2% and 2.99%: 2 Points o SBE Participation Percentage between 3% and 3.99%: 3 Points o SBE Participation Percentage between 4% and 4.99%: 4 Points o SBE Participation Percentage meeting or exceeding 5.00%: 5 Points NTP Construction May 2024 Project complete May 2025 Cost Forecast Project Cost Center Cost Forecast Land Acquisition No Construction= $6,000,000 The method of contractor selection has not been determined at this time.

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents