Similar Projects
On and Off Ramp Construction - TH 23
Infrastructure
Conception
$1,700,000 est. value
Willmar, MN 56201

Block 25 Lofts
New Construction, Infrastructure
Conception
$9,270,000 CJ est. value
Willmar, MN 56201

City Hall and Community Center - City of Willmar
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Willmar, MN 56201

Willmar Public School District Gymnasium / Ancillary Space Addition
Addition, Infrastructure - 19,540 SF
Bidding
$8,034,750 CJ est. value
Willmar, MN 56201

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

D8 Pavement Rejuvenation-Tracy and Slayton Stations
Infrastructure
Post-Bid
$200,000 est. value
Willmar, MN

Rubberized Asphalt Crack Filling
Results
MN

Willmar - Epitopix IBDPI Project
Infrastructure
Results
$100,000 est. value
Willmar, MN

Block 25 Lofts
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Willmar, MN 56201

Block 25 Lofts
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Willmar, MN 56201

Residential Fiber to the Home
Infrastructure
Post-Bid
$200,000 CJ est. value
Willmar, MN 56201

19th Avenue South East / Lakeland Drive South East Mill and Overlay
Infrastructure
Results
$195,000 est. value
Willmar, MN 56201

Lakeland Drive NE Multi-Family Development
New Construction, Infrastructure
Pending Verification
$81,400,000 CJ est. value
Willmar, MN 56201

Slim Chickens / Wilmar
New Construction, Infrastructure - 3,236 SF
Post-Bid
$1,500,000 CJ est. value
Willmar, MN 56201

Bituminous Seal Coat
Infrastructure
Results
$700,000 est. value
Willmar, MN

Last Updated 10/16/2023 08:32 AM
Project Title

22nd St NE Storm Sewer Improvement

Physical Address View project details and contacts
City, State (County) Dovre Township, MN 56201   (Kandiyohi County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $99,975 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

22nd St NE Storm Sewer Improvement Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing to the Issuing Office. Contact information and submittal procedures for such questions are as follows: 2040 Hwy. 12 East, Willmar, MN, 56201-5818, (320) 231-3956, fax (320) 231-9710 Stormwater Improvements, Sewer and Water Construction, Utility Street Construction and Excavation The work includes the construction of approximately: 220 SY Remove & Replace Concrete Pavement 1270 SY Erosion Control And Turf Establishment 550 LIT Ft 15" Dual Wall Hdpe Storm Pipe together with numerous related items of work, all in accordance with Plans and Specifications.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents