Reported | 01/29/2019 12:00 AM |
Project Title | Littick Hall HVAC Improvements Design/Build |
Physical Address | View project details and contacts |
City, State (County) | Zanesville, OH (Muskingum County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | $225,000 |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Alternative 1 - New Domestic HW Boiler with Package G/E Heating and Cooling Systems Demolition of the existing boilers, hot water pumps, and related appurtenances associated with the hydronic heating system and other related items not incorporated as a part of the proposed improvements. Installation of a natural gas domestic hot water only boilers serving Littick Hall and the MRC with a multiple unit package system. Connection to the existing plate frame heat exchanger and storage tank system shall be provided. Hydronic finned tubed heating units may be abandoned in- place. Three (3) existing roof top DX cooling units and ancillary equipment shall be demolished. One G/E package heating and cooling unit shall be installed to condition the space currently served by the DX units and finned coil perimeter heat (classroom area). Demolition of the existing unit ventilator system in the main entry and any ancillary unit heaters. Installation of the existing G/E heating and cooling package unit purchased with the MRC project with ductwork modifications /extensions as needed to include the entire entry and adjoining restrooms. As an additive alternate, include all control work required to enable operation by the existing campus BMS of the four (4) existing Littick Hall roof top G/E package systems installed with the MRC project. Alternative 2 - New Heating and Domestic HW Boiler, New DX Cooling Units, and Ex. G/E Unit Installation Demolition of the existing boilers, hot water pumps, and related appurtenances associated with the hydronic heating system and other related items not incorporated as a part of the proposed improvements. Installation of a natural gas package boiler system providing domestic hot water for Littick Hall and the MRC. Connection to the existing plate frame heat exchanger and storage tank system shall be provided. This same boiler system shall also provide hydronic heating hot water to the existing finned tubed perimeter heat units in the classroom area. The system shall be a multiple unit package system with new hot water pumps if required. Modification to the existing hydronic heating hot water piping shall be examined and provided, as needed, due to the reduced hot water flow. Three (3) existing roof top DX cooling units and ancillary equipment shall be demolished and replaced inkind. Demolition of the existing unit ventilator system in the main entry and any ancillary unit heaters. Installation of the existing G/E heating and cooling package unit purchased with the MRC project with ductwork modifications/extensions as needed to include the entire entry and adjoining restrooms. As an additive alternate, include all control work required to enable operation by the existing campus BMS of the four (4) existing Littick Hall roof top G/E package systems installed with the MRC project. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |