Similar Projects
Delaware County Junior Fair Building Upgrade
Post-Bid
$3,300,000 est. value
Delaware, OH

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Solon Parkside Elementary and Middle School HVAC Improvements Phase III
Results
$245,000 est. value
Solon, OH

Morehouse Pavilion AHU1 Replacement - Design-Build
Results
$1,216,000 est. value
Columbus, OH

Air Handler Replacements
Post-Bid
Less than $1,500,000 est. value
Dayton, OH

Wilmington High Rise Chiller Replacement
Results
Dayton, OH 45390

Design / Installation - Vehicle Exhaust Removal Systems at Two Fire Stations
Post-Bid
Monroe, OH 45050

Health Department Building Replacement of Package HVAC Unit and Controlling System
Results
Sidney, OH

Exterior Envelope Repairs and HVAC Upgrades of Building 1 at the Cincinnati Job Corps Center, Cincinnati, Ohio
Post-Bid
$1,000,000 to $5,000,000 est. value
Cincinnati, OH 45214

HVAC Unit(s) Installation at Family Support Center 2018.
Results
Batavia, OH

HVAC Rooftop Unit Replacement at Neighborhood Ministries - Rockford Village
Post-Bid
Youngstown, OH

Cuyahoga County Justice Center Complex - CPDHQ Building HVAC System Renovation
Results
Less than $592,494 est. value
Cleveland, OH

Cincinnati VA Medical Center's: Aircuity Optinet System
Post-Bid
Cincinnati, OH 45220

HVAC Maintenance
Term Contract
Results
Springfield, OH

J--Aircuity Service Contract This Sources Sought is Issued to Identify Capable and Interested Vendors that have the Ability to Preform the Work in the PWS.
Post-Bid
Cincinnati, OH 45220

Reported 01/29/2019 12:00 AM
Project Title

Littick Hall HVAC Improvements Design/Build

Physical Address View project details and contacts
City, State (County) Zanesville, OH   (Muskingum County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $225,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description Alternative 1 - New Domestic HW Boiler with Package G/E Heating and Cooling Systems Demolition of the existing boilers, hot water pumps, and related appurtenances associated with the hydronic heating system and other related items not incorporated as a part of the proposed improvements. Installation of a natural gas domestic hot water only boilers serving Littick Hall and the MRC with a multiple unit package system. Connection to the existing plate frame heat exchanger and storage tank system shall be provided. Hydronic finned tubed heating units may be abandoned in- place. Three (3) existing roof top DX cooling units and ancillary equipment shall be demolished. One G/E package heating and cooling unit shall be installed to condition the space currently served by the DX units and finned coil perimeter heat (classroom area). Demolition of the existing unit ventilator system in the main entry and any ancillary unit heaters. Installation of the existing G/E heating and cooling package unit purchased with the MRC project with ductwork modifications /extensions as needed to include the entire entry and adjoining restrooms. As an additive alternate, include all control work required to enable operation by the existing campus BMS of the four (4) existing Littick Hall roof top G/E package systems installed with the MRC project. Alternative 2 - New Heating and Domestic HW Boiler, New DX Cooling Units, and Ex. G/E Unit Installation Demolition of the existing boilers, hot water pumps, and related appurtenances associated with the hydronic heating system and other related items not incorporated as a part of the proposed improvements. Installation of a natural gas package boiler system providing domestic hot water for Littick Hall and the MRC. Connection to the existing plate frame heat exchanger and storage tank system shall be provided. This same boiler system shall also provide hydronic heating hot water to the existing finned tubed perimeter heat units in the classroom area. The system shall be a multiple unit package system with new hot water pumps if required. Modification to the existing hydronic heating hot water piping shall be examined and provided, as needed, due to the reduced hot water flow. Three (3) existing roof top DX cooling units and ancillary equipment shall be demolished and replaced inkind. Demolition of the existing unit ventilator system in the main entry and any ancillary unit heaters. Installation of the existing G/E heating and cooling package unit purchased with the MRC project with ductwork modifications/extensions as needed to include the entire entry and adjoining restrooms. As an additive alternate, include all control work required to enable operation by the existing campus BMS of the four (4) existing Littick Hall roof top G/E package systems installed with the MRC project.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents