Similar Projects
Bondecroft Elementary School Addition
Addition
Conception
Sparta, TN 38583

Gym and Safety Renovations - Richland Elementary School
Renovation
Conception
$5,000,000 est. value
Memphis, TN 38120

Virtual School Offices Build Out
New Construction, Renovation, Addition, Build-Out
Design
$4,000,000 est. value
TN

Newport Grammar School Interior Renovation
Renovation
Design
$500,000 CJ est. value
Newport, TN 37821

Casework Replacement at Fairview High School, Allendale, Clovercroft, Longview, Nolensville and Pearre Creek Elementary Schools
Renovation
Bidding
$450,000 CJ est. value
Fairview, TN 37062

Playground Relocation & Renovation Project
Infrastructure
Bidding
$200,000 CJ est. value
Millington, TN 38053

Hope Street Cte Demolition Package
Demolition
Sub-Bidding
$1,662,000 CJ est. value
Bolivar, TN 38008

New Stoner Creek Elementary School
New Construction
Post-Bid
TN 37122

Fire Alarm Inspections
Alteration
Post-Bid
Tazewell, TN

Chattanooga School for the Liberal Arts
New Construction
Results
Chattanooga, TN 37416

Eastview ES and Tusculum View ES Nurse Station
Renovation
Results
Greeneville, TN 37745

Lightbridge Academy
New Construction - 10,568 SF
Construction
$2,840,000 est. value
Hendersonville, TN 37075

Spring Hill High School Conversion to Elementary School
Build-out, Renovation, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Columbia, TN 38401

Gunbarrel Road and Goodwin Road Mixed Use
New Construction, Infrastructure
Pending Verification
$275,000,000 CJ est. value
Chattanooga, TN 37402

Northwest Elementary School Construction - Knox County
New Construction, Infrastructure
Conception
$8,950,000 CJ est. value
Knoxville, TN 37902

Last Updated 02/22/2023 09:40 AM
Project Title

Remodel of Building at 4318 Highway 641 Into Early Childhood Learning Center

Physical Address View project details and contacts
City, State (County) Decaturville, TN 38329   (Decatur County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status All Submissions Received, Results Expected, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project action list includes: 1. Anti-Microbial, waterproof laminate floating floor (Pergo or Lifeproof preferred) a) Color chosen by owner b) Throughout both main rooms and bathrooms c) Replace baseboard after flooring install 2. Remove Wood wall in front of bathrooms 3. Move section of wall behind small room leading to kitchen to the range hoods a) Add sink, cabinets, and countertops b) Will require running plumbing through the attic to create water for sink 4. Replace hot water heater to standard 50-gallon tan (Gas) 5. Replace two (2) HVAC units (gas) a) No trade in- current units being repurposed 6. Create pantry unit in current office space a) Shelving and storage units 7. Replace current kitchen sink with apron sink 8. Install security system with cameras 9. Cover pipes at back of main room and build half wall a) Include countertop along wall (chosen by owner) b) Half door in middle 10. Cap water well and remove well house 11. Remove spotlights in side room 12. Patch all drywall and paint both main rooms and bathroom a) Color chosen by owner 13. Remove electrical outlets from floor 14. Take out two windows and replace with glass exit doors 15. Replace any ceiling tiles that are damaged 16. Run ventilation for plumbing from attic to the exterior 17. Replace soft spot-on right side of the roof and back side at roof penetration 18. Replace sealant at roof penetrations 19. Replace and repair loose roof fasteners 20. Add gutters to front of the building 21. Replace doorknobs on bathrooms with pull levers **Electrical and plumbing changes to be completed by EPC Teacher and students at Riverside, not to be included in bid. ***All Usable appliances/materials will be repurposed within the school system and should not be considered for trade-in or discount. Bids shall be presented in sealed envelopes, plainly marked on the outside with name of person or firm submitting bid. Bids will be received only from responsible firms or persons capable of filling same. The board has committed to award bid to the low bidder. The owner reserves the express right to accept any bid or reject any and or all bids and to waive any informalities therein.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents