Similar Projects
Water Reclamation Air Lifts - 22R03 - North Shore Water Reclamation District
Renovation
Conception
$3,025,300 est. value
Gurnee, IL 60031

Wastewater Treatment Facility - Phase 2A Rehabilitation
New Construction, Infrastructure
Design
Batavia, IL

New Well 18 With Treatment Plant
Renovation
Bidding
$300,000 est. value
Frankfort, IL 60423

Riverside Water Treatment Plant Main Switchgear Improvements
Renovation, Alteration
Bidding
$390,000 est. value
Elgin, IL 60123

Digester Rehabilitation
Renovation
Post-Bid
Glendale Heights, IL 60139

Clark Street Water Treatment Plant Pressure Filter Media Replacement
Post-Bid
Sandwich, IL 60548

Water Reclamation Center Dewatering System Improvements
Results
$2,000,000 est. value
Carol Stream, IL 60188

WWTP Blower and Aeration Equipment Improvements
Renovation
Results
Lanark, IL

Core & Main building
New Construction - 12,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Washington, IL

Air Stripping Tower Cleaning at Lime Softening Water Treatment Plant(LSWTP)
New Construction
Bidding
Montgomery, IL

Wastewater Treatment Facility Disinfection Improvements
Renovation
Post-Bid
Mendota, IL 61342

Water Treatment Plant Filter Rehabilitation
Renovation
Results
Metropolis, IL

Biosolids Handling System Upgrades
Renovation
Post-Bid
Collinsville, IL 62234

Water System Improvements
Renovation
Results
Le Roy, IL

Water Treatment Plant Capital Improvements- East Reservoir Renovations And Repairs
Renovation
Post-Bid
Waukegan, IL

Reported 06/23/2022 08:15 AM
Project Title

Water Reclamation Transformers - Construction - 22R02 - North Shore Water Reclamation District

Physical Address View project details and contacts
City, State (County) Gurnee, IL 60031   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected January 2024
Bids Due View project details and contacts
Estimated Value $19,570,200
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a water / sewer project in Gurnee, Illinois. Conceptual plans call for the renovation of a water / sewer project. A detailed scope has not yet been determined. This project is in included in the City's or County's FY 2023-2027 Capital Improvement Plan (CIP). As of June 22, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 33 - Utilities, Utility Transformers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents