Similar Projects
Hyde Park Restroom - 319615 - City of St.Joseph
New Construction, Infrastructure
Conception
$482,820 CJ est. value
Saint Joseph, MO 64504

Cosmo Rec Area: Parks Mgmt Center Improvements - 457 - City of Columbia
Renovation
Conception
$200,000 CJ est. value
Columbia, MO 65202

Park Shelter for More's Lake at the City of Columbia Municipal Power Plant
Infrastructure
Design
$100,000 CJ est. value
Columbia, MO 65201

SOFTBALL FIELD ARTIFICIAL PLAYING SURFACE AND FENCING
Infrastructure
Design
$300,000 CJ est. value
Kirksville, MO 63501

General Site - Research Commons Thermal Plant
New Construction, Infrastructure
Bidding
$12,636,825 CJ est. value
Columbia, MO 65203

RFQ Construction Manager at Risk - Missouri Psychiatric Center - Infrastructure and ED Observation Renovation
Demolition, Build-out, Renovation, Infrastructure - 5,800 SF
Bidding
$6,079,260 CJ est. value
Columbia, MO 65201

Earth Moving Services - Multi Year
Term Contract, Infrastructure
Post-Bid
Columbia, MO

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

FMS Building
Addition
Results
Saint Joseph, MO

Rough Site Grading, Parking and Storm Water System Installation
Infrastructure
Results
Columbia, MO

Rolling Hills Library Savannah Branch Parking Lot & Retaining Wall
Infrastructure
Construction
$324,000 CJ est. value
Savannah, MO 64485

RFQ Design - Professional Architectural and Engineering Design Consulting Services
New Construction, Infrastructure
Pending Verification
$67,000,000 CJ est. value
Columbia, MO 65203

Providence South Plaza
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Columbia, MO 65201

Chapel Hill Connector - Perche Creek Trail - 00745 - 1949 - City of Columbia
Infrastructure
Conception
$500,000 CJ est. value
Columbia, MO 65203

Warehouse and Enclosed Equipment Parking - E0176 - 1593 - City of Columbia
New Construction, Infrastructure
Design
$4,800,000 CJ est. value
Columbia, MO 65203

Last Updated 12/21/2022 09:03 AM
Project Title

Crawford County Coroner Office

Physical Address View project details and contacts
City, State (County) Cuba, MO 65453   (Crawford County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of complete remodeling and renovation to an existing approx. 1500 sq.ft. wood framed building, along with additions, which will become a 3250 sq.ft. coroner's office. All equipment, materials and workmanship shall be in accordance with all project drawings, detailed specifications and documents prepared by AEA-Stack Design Group. Bidders having questions or requesting additional information should contact Irvin "Corky" Stack, P.E., Project Manager at AEA Stack Design Group. Proposals shall be submitted on the blank forms bound in the contract documents or issued in any addendum and provided for that purpose. The Owner intends to award the contract to the most responsive, responsible bidder submitting the lowest bid. The Crawford County Commission reserves the right to reject any and all bids considered by them to be materially unbalanced or non-responsive, and affirms their right to accept or reject any or all bids received, without limitation, and to waive or not to waive any or all irregularity, informality, or technicality in any bid, and to award the contract deemed by them to be in their best interest. The County of Crawford is an Equal Opportunity Employer and invites the submission of bids from minority and women-owned firms. Bid security in the amount of five percent (5%) of the bid amount must accompany each bid, in accordance with the Instructions to Bidders. As a condition of the Contract, the successful Bidder will be required to provide separate Performance and Payment Bonds, each in the amount of 100% of the Contract Amount. The Contractor shall pay not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial Relations and as set out in the detailed plans and specifications. The wage rates applicable to this project have been predetermined as required by law and are set forth in the specifications. Upon signing the contract, the contractor and any subcontractor performing the work shall provide a ten-hour Occupational Safety and Health Administration (OSHA) construction safety program for their on-site employees which includes a course in construction safety and health approved by OSHA or a similar program approved by the Missouri Department of Labor and Industrial Relations which is at least as stringent as an approved OSHA program. All employees are required to complete the program within sixty (60) days of beginning work on such construction project. Any employee found on the worksite without documentation of the successful completion of such a course shall be afforded twenty (20) days to produce such documentation before being subject to removal from the project. Payment for the work under this contract will be made in cash in accordance with the payment provisions stipulated in the contract. The contract contains a provision for liquidated damages.

Details

,, 3,250 SF - 1,750 SF. 1,500 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents