Project Title | North - North Plum Street Improvements |
Physical Address | View project details and contacts |
City, State (County) | Tipton, IA 52772 (Cedar County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected June 2024 |
Bids Due | View project details and contacts |
Estimated Value | $584,456 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Excavation, Class 10 - 1,561 CY; Subgrade Preparation (12" Thick) - 3,455 SY; Subbase, Modified, 6" Thick - 3,455 SY; Compaction Testing - Lump Sum; Trench Foundation - 50 TON; Trench Compaction Testing - Lump Sum; Storm Sewer, Trenched, PVC, 4" - 30 LF; Storm Sewer, Trenched, 12" - 166 LF; Storm Sewer, Trenched, RCP, 12" - 53 LF; Storm Sewer, Trenched, 15" - 150 LF; Storm Sewer, Trenched, RCP, 15" - 53 LF; Storm Sewer, Trenched, 18" - 372 LF; Removal of Storm Sewer, All Types, <15" - 474 LF; Pipe Apron, Metal or RCP, 12" - 4 EA; Subdrain, Type 1 (Longitudinal Subdrain), 4" Dia. - 1,670 LF; Subdrain Outlets and Connections, CMP or PVC, 4" or 6" - 8 EA; Lower/Relocate Existing Water Service - 5 EA; Intake, SW-501 - 1 EA; Intake, SW-502, 48" Dia. - 2 EA; Intake, SW-503 - 1 EA; Intake, SW-505 - 1 EA; Intake, SW-506 - 1 EA; Intake, SW-512, Case 1, 24" Riser - 5 EA; Manhole Adjustment, Minor - 2 EA; Connection to Existing Intake - 1 EA; Modify Existing Intake - Lump Sum; Pavement, PCC, 7" Thick, C3 or C4 (with Baskets) - 3,058 SY; PCC Pavement Samples and Testing - Lump Sum; Removal of Driveway - 257 SY; Driveway, Paved, PCC, 6" Thick - 337 SY; Driveway, Granular - 45 TON; Pavement Removal - 2,106 SY; Temporary Granular Surfacing - 130 TON; Temporary Traffic Control - Lump Sum; Seeding, Fertilizing, and Mulching - Lump Sum; Warranty - Lump Sum; SWPPP Preparation - Lump Sum; SWPPP Management - Lump Sum; Rip Rap, Class D - 25 TON; Silt Fence or Silt Fence Ditch Check - 250 LF; Silt Fence or Silt Fence Ditch Check, Removal of Sediment - 250 LF; Silt Fence or Silt Fence Ditch Check, Removal of Device - 250 LF; and Mobilization - Lump Sum. Est. Value - $ 584,456.00 Each bidder shall accompany its bid with bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in form acceptable to the City, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract Successful Bidder will be required to furnish Performance, Payment and Maintenance Bond acceptable to the City of Tipton on the form provided in the specifications in amounts equal to one hundred percent (100%) of the contract price. Liquidated damages in the amount of Seven Hundred Fifty Dollars ($750.00) per consecutive working day will be assessed for each day that the work shall remain uncompleted after the end of the contract period with due allowance for extension of contract period due to conditions beyond the control of the Contractor. The contract shall be fully completed and ready for final payment within 70 working days from written Notice to Proceed. The Notice to Proceed will be issued on or about June 1, 2024. The City of Tipton reserves the right to reject any and all bids. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |