Tipton High School Track Resurfacing project
Infrastructure
Bidding
$150,000 CJ est. value
Tipton, IA 52772

Tipton Concession, Sidewalks and Fencing Project
Infrastructure, Renovation - 9,000 SF
Post-Bid
$500,000 CJ est. value
Tipton, IA 52772

Tipton Concession, Sidewalks and Fencing Project
Infrastructure, Renovation - 9,000 SF
Post-Bid
$500,000 CJ est. value
Tipton, IA 52772

HMA Resurfacing with Milling
Infrastructure
Results
$2,000,000 to $2,500,000 est. value
West Branch, IA 52358

RCB Culvert Replacement - Twin Box
Infrastructure
Results
$320,445 CJ est. value
Lowden, IA 52255

Fog Seal
Infrastructure
Pending Verification
$549,553 CJ est. value
Tipton, IA 52772

Fog Seal
Infrastructure
Pending Verification
$549,553 CJ est. value
Tipton, IA 52772

East Side Water Main Replacement
Infrastructure
Post-Bid
$500,000 CJ est. value
West Branch, IA 52358

PCC Pavement-Replace
Infrastructure
Results
$6,202,939 CJ est. value
Tipton, IA 52772

I-80 Utility Relocation
Infrastructure
Results
$747,982 CJ est. value
West Branch, IA 52358

Sanitary Sewer Replacement
Infrastructure
Results
$154,176 CJ est. value
Lowden, IA 52255

Replace Foundations - Staples, Wright, and Isaac Miles PMIS 258441, 247883, 247951
Infrastructure
Results
$1,344,220 CJ est. value
West Branch, IA 52358

Durant 9th Avenue Storm Sewer Replacement
Demolition, Infrastructure
Results
$869,716 CJ est. value
Durant, IA 52747

Bridge Replacement - CCS
Demolition, New Construction, Infrastructure
Results
$588,907 CJ est. value
Tipton, IA 52772

Phase 2 East Side Water Main Replacement
Infrastructure
Results
$750,000 CJ est. value
West Branch, IA 52358

Last Updated 02/16/2024 04:07 PM
Project Title

North - North Plum Street Improvements

Physical Address View project details and contacts
City, State (County) Tipton, IA 52772   (Cedar County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $584,456 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation, Class 10 - 1,561 CY; Subgrade Preparation (12" Thick) - 3,455 SY; Subbase, Modified, 6" Thick - 3,455 SY; Compaction Testing - Lump Sum; Trench Foundation - 50 TON; Trench Compaction Testing - Lump Sum; Storm Sewer, Trenched, PVC, 4" - 30 LF; Storm Sewer, Trenched, 12" - 166 LF; Storm Sewer, Trenched, RCP, 12" - 53 LF; Storm Sewer, Trenched, 15" - 150 LF; Storm Sewer, Trenched, RCP, 15" - 53 LF; Storm Sewer, Trenched, 18" - 372 LF; Removal of Storm Sewer, All Types, <15" - 474 LF; Pipe Apron, Metal or RCP, 12" - 4 EA; Subdrain, Type 1 (Longitudinal Subdrain), 4" Dia. - 1,670 LF; Subdrain Outlets and Connections, CMP or PVC, 4" or 6" - 8 EA; Lower/Relocate Existing Water Service - 5 EA; Intake, SW-501 - 1 EA; Intake, SW-502, 48" Dia. - 2 EA; Intake, SW-503 - 1 EA; Intake, SW-505 - 1 EA; Intake, SW-506 - 1 EA; Intake, SW-512, Case 1, 24" Riser - 5 EA; Manhole Adjustment, Minor - 2 EA; Connection to Existing Intake - 1 EA; Modify Existing Intake - Lump Sum; Pavement, PCC, 7" Thick, C3 or C4 (with Baskets) - 3,058 SY; PCC Pavement Samples and Testing - Lump Sum; Removal of Driveway - 257 SY; Driveway, Paved, PCC, 6" Thick - 337 SY; Driveway, Granular - 45 TON; Pavement Removal - 2,106 SY; Temporary Granular Surfacing - 130 TON; Temporary Traffic Control - Lump Sum; Seeding, Fertilizing, and Mulching - Lump Sum; Warranty - Lump Sum; SWPPP Preparation - Lump Sum; SWPPP Management - Lump Sum; Rip Rap, Class D - 25 TON; Silt Fence or Silt Fence Ditch Check - 250 LF; Silt Fence or Silt Fence Ditch Check, Removal of Sediment - 250 LF; Silt Fence or Silt Fence Ditch Check, Removal of Device - 250 LF; and Mobilization - Lump Sum. Est. Value - $ 584,456.00 Each bidder shall accompany its bid with bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in form acceptable to the City, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract Successful Bidder will be required to furnish Performance, Payment and Maintenance Bond acceptable to the City of Tipton on the form provided in the specifications in amounts equal to one hundred percent (100%) of the contract price. Liquidated damages in the amount of Seven Hundred Fifty Dollars ($750.00) per consecutive working day will be assessed for each day that the work shall remain uncompleted after the end of the contract period with due allowance for extension of contract period due to conditions beyond the control of the Contractor. The contract shall be fully completed and ready for final payment within 70 working days from written Notice to Proceed. The Notice to Proceed will be issued on or about June 1, 2024. The City of Tipton reserves the right to reject any and all bids.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents