Similar Projects
FY 19/20 Water Main Replacements
Infrastructure
Bidding
$2,822,742 est. value
Salt Lake City, UT 84104

4100 South Secondary Waterline Project
Post-Bid
Magna, UT 84044

Little Cottonwood Penstock Lining Repair
Post-Bid
Murray, UT 84107

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Wild Creek and River Oaks Waterline Project
Results
Sandy, UT 84070

Secondary Water Meter Installation
Post-Bid
South Jordan, UT 84095

2020 Utility Grade Adjustment
Results
West Jordan, UT 84088

River Bottom Improvement Project Prequalification
Post-Bid

City Creek Filter Media Replacement
Results
Less than $2,000,000 est. value
Salt Lake City, UT 84103

2021 Deer Ridge Waterline Cathodic Protection
Infrastructure
Post-Bid
Draper, UT 84020

Lee Kay Fish Hatchery Water Quality Monitoring and Alarm System
Results
$20,000 to $30,000 est. value
Salt Lake City, UT 84148

Heritage Park Interactive Water Feature
Infrastructure
Post-Bid
South Jordan, UT 84095

Rushton Groundwater Treatment Plant Filter Vessel
Results
Salt Lake City, UT 84170

Upper Conduit Repair - Construction Phase 1
Infrastructure
Post-Bid
$1,287,262 est. value
Salt Lake City, UT

Page Sharmel Water Improvements Project
Results
Less than $1,611,164 est. value
Salt Lake City, UT

Last Updated 01/27/2022 09:52 AM
Project Title

2022 Water Leak Detection Program

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $80,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Implementing multi-year (one year with the option to renew an additional four years) leak detection survey in 2022. Provides water and wastewater services to approximately 130,000 customers, covering a 24.5 square mile area in the central portion of Salt Lake County known as West Valley City. The District operates and maintains roughly 380 miles of water mains and approximately 28,000 retail water service connections providing water services to industrial, commercial, and residential customers. In 2021, the District completed a leak detection program primarily focused on our cast iron and metallic water mains that inspected approximately 100 miles of pipeline. Three quarters of water pipelines in the District remain to be surveyed and this survey will focus primarily on non-metallic pipe materials. District water main sizes and types vary from 4-inches to 30-inches in diameter, with PVC making up approximately 65 percent of the District’s water main pipe material. District water main sizes and types vary from 4-inches to 30-inches in diameter, with PVC making up approximately 65 percent of the District’s water main pipe material. Cast iron is the second-largest material type accounting for roughly 25 percent of our water mains. Steel, asbestos concrete, and ductile iron make up the remaining pipe materials.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents