Similar Projects
Equipment - Carport and Guard Shack
Alteration
Design
Teec Nos Pos, AZ 86544

Grounds Equipment Repair and Parts
Term Contract
Design
Marana, AZ 85653

Furnace Replacement
Renovation
Sub-Bidding
$50,000 CJ est. value
Chinle, AZ 86503

Cooler Repair
Renovation
Sub-Bidding
$100,000 CJ est. value
Whiteriver, AZ 85941

Citywide Meter Vault Improvements - Phase IV
Renovation
Post-Bid
$2,887,000 CJ est. value
Glendale, AZ 85301

Factory Authorized Installation - Revent Ovens
Renovation
Post-Bid
$200,000 CJ est. value
Phoenix, AZ 85009

Walk Thru Metal Detectors (WTMD)
Results

Walk Thru Metal Detectors (WTMD)
Results

Upgrade PLC System at FCC Tucson
Renovation
Sub-Bidding
$5,000,000 CJ est. value
Tucson, AZ 85756

Kitchen and Cafeteria Equipment Repair Services
Alteration
Post-Bid
Phoenix, AZ

Single Phase Pad Mount Transformer
Infrastructure
Results
Safford, AZ

Sedona Airport Automated Weather Observing System Replacement Project
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Sedona, AZ 86336

Granular Activated Carbon Media
Alteration
Post-Bid
$300,000 est. value
Tucson, AZ

Supply Operated Hauling Equipment
Term Contract
Results
Prescott, AZ

Asphalt Cold Patching Material (Bag)
Term Contract
Sub-Bidding
Yuma, AZ 85364

Last Updated 08/26/2023 06:38 AM
Project Title

Building 107 Domestic Water Boiler Replacement Carl Hayden Bee Research Center

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85719   (Pima County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

1. Work Coordinate work with on-site staff. Lock out/tag out electrical, natural gas and domestic water. Disconnect flue piping and environmentally dispose of (1) boiler. Provide and install (1) Parker model WH300 indirect fired water heater in existing location. Provide and install (1) new Bell and Gossett 1/2 hp inline pump. Reconnect flue piping to existing with new draft hood, flue piping and fittings as required. Reconnect natural gas piping with new piping and fittings as required. Reconnect domestic water supply and return piping with new copper piping and fittings as required. Reconnect electrical with new seal tight, wire and fittings as required. Start up and check for proper operation. Provide domestic water sterilization for boiler only. Reinsulate new piping to match existing. Provide IOM manuals. Provide 1 year warranty on all labor, equipment and materials supplied by DLJCG. a. Provide a standard commercial warranty against product defect and breakage and one year warranty on labor and other parts. b. Contractors shall provide and maintain all necessary guards, lights, barricades, etc., to protect persons, property, and materials in and around the site. c. Do not disturb hazardous materials and report condition immediately to the Contracting Officers Representative (COR) regarding potentially hazardous conditions that are uncovered. Stop work in the area of the questionable material or condition until identification and direction is provided. d. The Contractors work shall adhere to the criteria stated within these project requirements, drawings, and specifications. All construction shall comply with applicable federal, state, and local code requirements as well as current industry standards, (i.e., IBC, NEC, NSPC, NFPA, EPA, ASTM, GSA, AASHTO, etc.) and health and safety codes, in effect at the time of contract award. Domestic water boiler replacement in building 107 basement boiler room. NOTE: Funds are not currently available for this requirement IAW FAR 52.232-18. Award is contingent on receiving funding. This is a request for quote for a domestic water boiler for the USDA ARS in Tucson, AZ. Please see the attached documents for important information including instructions on how and when to submit quotes. This is a total small business set-aside with a magnitude of between $25,000 and $100,000. NOTE: Funds are not currently available for this requirement IAW FAR 52.232-18. Award is contingent on receiving funding. All work shall be done in accordance with (IAW) the terms and conditions, drawings, statement of work (SOW) and other attachments set forth in the RFQ. IAW FAR 36.204 the estimated magnitude of this project is between $25,000 and $100,000. Completion shall be 90 days after issuance of the notice to proceed (NTP) Dept. of Labor General Decision #AZ20230032 dated 6/23/2023 is applicable to this contract. Provide all labor, materials, equipment, 1 JC supplies, supervision, and transportation needed to complete the replacment of a Domestic Water Boiler (Bldg 107). Delivery: 90 Days After Notice to Proceed All questions pertaining to this solicitation, including questions that arise during the site visit, must be submitted to Michael.Sherlock@usda.gov 9:00 a.m. PST, Friday, September 8, 2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents