Similar Projects
2021/22 Collector Street Pavement Improvements - Hoover Avenue - City of Ames
Infrastructure
Conception
$2,000,000 CJ est. value
Ames, IA 50010

2021/22 Collector Street Pavement Improvements - Hoover Avenue - City of Ames
Infrastructure
Conception
$2,000,000 CJ est. value
Ames, IA 50010

Lime Lagoon Improvements - City of Ames
New Construction, Infrastructure
Design
$1,353,000 CJ est. value
Ames, IA 50010

2025/26 Cyride Facility Improvements - Addition to New/Existing Facility - City of Ames
Addition, New Construction, Infrastructure
Design
$750,000 CJ est. value
Ames, IA 50011

East 13th Street Sanitary Sewer Extension - City of Ames
Infrastructure
Bidding
$2,833,234 CJ est. value
Ames, IA 50010

RFP - Ames Industrial Park Development
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Ames, IA 50010

Test Drilling at North River Valley
Infrastructure
Post-Bid
$50,000 est. value
Ames, IA

Pcc Pavement - Replace
Infrastructure
Results
IA

U.S. 69 - PCC Patching
Infrastructure
Results
$125,000 est. value
IA

Power Plant Building Office Entrance - City of Ames
Renovation, Infrastructure
Conception
$500,000 CJ est. value
Ames, IA 50010

Concrete Repairs at Athletics Locations
Infrastructure
Post-Bid
$80,000 CJ est. value
Ames, IA 50010

LED 4000K Roadway Lighting
Infrastructure
Results
$300,000 est. value
Ames, IA

2021/22 Storm Water Facility Rehabilitation - City of Ames
Infrastructure
Conception
$150,000 CJ est. value
Ames, IA 50010

Electric Services Department Public Improvement Project
Infrastructure
Post-Bid
$225,000 CJ est. value
Ames, IA 50010

PCC Pavement - Replace
Infrastructure
Results
$7,500,000 to $10,000,000 est. value
Nevada, IA

Last Updated 09/18/2023 09:21 AM
Project Title

Fire Station #3 Concrete Replacement - City of Ames

Physical Address View project details and contacts
City, State (County) Ames, IA 50010   (Story County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $342,338 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Fire Station #3 was constructed in 2002. Since its construction, the concrete driveway has continued to deteriorate around the structure. Public Works engineers have evaluated the driveway and recommended repair options, which range from patching to complete reconstruction. Multiple patches have been applied to the concrete over the last five years but were only temporary until the entire driveway could be replaced. The project is included in the city's 2022-2027 capital improvement plan (CIP). As of October 13, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of September 18, 2023, no new information available

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents