Similar Projects
Slate Valley Walking Trail
New Construction - 3,600 SF
Design
Less than $15,000 est. value
Poultney, VT 05764

2021 Sidewalk Replacement Project
Infrastructure
Bidding
Bristol, VT

Slip Formed Concrete Curbing 2020
Post-Bid
Rutland, VT

STP CVRT(2) - Winooski River Bridge and Bike Path Construction
Post-Bid
Montpelier, VT

West Rutland Sidewalk Segments STP BP15(1)
Results
$500,000 to $1,000,000 est. value
West Rutland, VT 05777

Kocher Drive - STP Sidewalk (12) and STP BP18(014)
Results
$500,000 to $1,000,000 est. value
Bennington, VT 05201

IQ004 Indefinite Delivery / Indefinite Quantity Primary Contracts -Contractor On-Ramp
Post-Bid
Montpelier, VT 05633

East Montpelier STP BIKE (63)
Results
$500,000 to $1,000,000 est. value
East Montpelier, VT 05651

Sidewalk to Missisquoi Valley Union High School Swanton STP BP19(5)
Post-Bid
Swanton, VT

Mt. Philo Summit Trail Reconstruction
Results
Charlotte, VT

Lyndon Town School Sidewalks
Post-Bid
Lyndonville, VT 05851

Fair Haven Rest Area Sidewalk Replacement
Results
$24,345 est. value
Fair Haven, VT

Concrete Sidewalk Installation
Post-Bid
Rutland, VT 05702

CY-20 Sidewalk Program
Results
$900,000 to $1,200,000 est. value
Burlington, VT

Snow Removal
Post-Bid
Brattleboro, VT

Last Updated 06/02/2021 08:24 AM
Project Title

Conant Square Park & Ride

Physical Address View project details and contacts
City, State (County) Brandon, VT 05733   (Rutland County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $92,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work to be performed under this project includes: Fine grade existing gravel parking area, pave parking area, installation of light pole foundations and electrical conduit, installation of grade level spreader at north edge, remove and till no-paved areas to add topsoil and seed, installation of concrete sidewalk and bus pad. The project is intended to begin in July of 2021 and shall be completed on or before October 31, 2021.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents