Similar Projects
Last Updated | 06/28/2023 10:32 PM |
Project Title | Existing Field Building Upgrades, New Storage Building, New Field Building |
Physical Address | View project details and contacts |
City, State (County) | Hamilton, NJ 08215 (Atlantic County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,174,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contract(s): Single Overall Contract (DPMC: C009 with C029, C030, C032, C047) Project Description: The Base Bid work consists of but is not limited to the following: Absegami High School: Renovations (finishes, door, frame & hardware, signage, toilet accessories, metal casework, fire extinguisher, selective roof repair @ new vent pipe & mech curb, etc.) to the existing Concession Area, Women's and Men's Toilet Rooms. All plumbing, mechanical and electrical system work. Cedar Creek High School: All Site Work including indicated access roads, pavement, utility services. New Concessions Building including but not limited to Concession Area, Janitor's Closet, Women's & Men's Toilet Rooms, and Storage Room. All plumbing, mechanical and electrical system work. Oakcrest High School: Renovations (finishes, door, frame & hardware, signage, toilet accessories, metal casework, fire extinguisher, selective roof repair @ new vent pipe & mech curb, etc.) to the existing Concession Area, Women's and Men's Toilet Rooms. All plumbing, mechanical and electrical system work. Alternate Bids: Alternate Bid No. 1: New Storage Building at Oakcrest HS. Alternate Bid No. 1A: Single-Ply EPDM Roofing System with a 30 Year Roof Warranty at the Oakcrest HS - New Storage Building. Alternate Bid No. 2: Single-Ply EPDM Roofing System with a 30 Year Roof Warranty at the Cedar Creek HS - New Concession Building. Alternate Bid No. 3: Fiberglass Asphalt Roofing Removal and Replacement at the Absegami High School - Concession Building. Alternate Bid No. 4: Counter Shutter Replacement at the Absegami HS and Oakcrest HS - Existing Concessions Buildings. Alternate Bid No. 5: NOT USED Alternate Bid No. 6: New Kitchen Hood and Fire Alarm Renovations at Absegami HS - Concession Building. Alternate Bid No. 7: Kitchen Hood and Fire Alarm Input at Oakcrest HS Concession Building. FVHD Contact: All requests for information (RFI) must be submitted in writing by May 18, 2023, and sent by emailing cwoodward@fvhdpc.com, or faxing 609-883-2694, or via common carrier to the Architect. All correspondence must include the Architect Project Name and Project Number referenced. Additional Information: Physical Work Start Date: July 3, 2023; Substantial Completion: May 31, 2024. Final Completion: July 1, 2024 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |