Similar Projects
Underground Chilled Water and Heating Water Piping Replacement – Phase 1 Rockville Campus
Bidding
Rockville, MD 20850

Pool Pak, Dectron, Libert, Miscellaneous HVAC Repair And Other Services
Bidding
Rockville, MD

Bldg. 302 Boiler Inspection
Post-Bid
Gaithersburg, MD

Sources Sought - Dust Collector Machine
Post-Bid
Gaithersburg, MD

Replace Hot Water Heater at Maus Warfield Memorial USAR Center in Rockville, MD 20851
Results
Less than $25,000 est. value
Rockville, MD 20851

Thermostat Replacement in Portable Classrooms
Results
Rockville, MD 20850

HVAC Preventative Maintenance and Service
Post-Bid

Repair HVAC System in Montgomery County
Results
Less than $100,000 est. value
Gaithersburg, MD

Request for Information: Boundary Layer Wind Tunnel
Post-Bid
Bethesda, MD

Montgomery County Recycling Center Fiber Building HVAC, Ventilation and Vacuum System Installation
Results
Derwood, MD 20855

NIF 4.7T Electronics Room Air Handler & Chilled Water Coil Replacement
Post-Bid
Bethesda, MD 20814

HVAC and Mechanical Equipment Preventative Maintenance and Repair Olney Readiness Center
Term Contract
Results
Less than $50,000 est. value
Gaithersburg, MD 20882

Filters, Air and HVAC
Term Contract
Post-Bid
Gaithersburg, Rockville, MD 20879

HVAC and Mechanical Equipment Preventative Maintenance and Repair Laurel Readiness Center and FMS
Term Contract
Results
Less than $50,000 est. value
Laurel, MD 20708

Gaithersburg Maintenance Facility
Term Contract
Post-Bid
Less than $50,000 est. value
Gaithersburg, MD 20878

Last Updated 11/11/2019 02:39 PM
Project Title

HVAC System and Installation

Physical Address View project details and contacts
City, State (County) Gaithersburg, MD 20877   (Montgomery County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Recovery of old HVAC split system, properly dispose of old unt and refrigerant, and furnish and install two (2) new 10-ton split systems.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents