Similar Projects
ComEd Vault Ventilation (Construction)
Infrastructure
Design
$100,000 to $250,000 est. value
Chicago, IL 60612

Chiller Start-Up, Preventative Maintenance and Repair at The Department of Corrections Complex
Term Contract
Sub-Bidding
Chicago, IL 60608

McClellan Elementary School Full Retube - Boiler 1 and 2
Renovation
Sub-Bidding
$400,000 CJ est. value
Chicago, IL 60609

HVAC and Mechanical Products
Term Contract
Post-Bid

Staff Lounge and HVAC Improvements at Algonquin Middle School
Post-Bid
Des Plaines, IL 60016

Building X: AHU-2 Fan Array Retrofit
Results
Palatine, IL

HVACR Services - Ice Refrigeration Equipment
Results
Northbrook, IL 60062

Mason Elementary School Steam Coil Replacement
Renovation
Sub-Bidding
$800,000 CJ est. value
Chicago, IL 60623

RTU Replacement at Chippewa
Post-Bid
Palos Heights, IL 60463

HVAC Services
Results
Northbrook, IL

Fort Dearborn School Boiler Feed Tank
Renovation
Sub-Bidding
$300,000 CJ est. value
Chicago, IL 60620

Kitchen Exhaust Hood Improvement
Post-Bid
Markham, IL

Replace Failed AHU-1 & Chiller for Endoscopy
Results
$1,000,000 to $2,000,000 est. value
Chicago, IL 60612

Replace Air Handling Units (AHU) S-4 and S-10 - University of Illinois Hospital (UIH) - Division 1
Renovation
Sub-Bidding
$90,000 CJ est. value
Chicago, IL 60612

HVAC Upgrade and Roofing
Post-Bid
Hazel Crest, IL 60429

Last Updated 09/14/2022 08:34 AM
Project Title

Metcalfe Chiller

Physical Address View project details and contacts
City, State (County) Chicago, IL 60628   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Bids by Invitation, Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Metcalfe Chiller ITB Preapproved VT Vendors Only Scope of Work North chiller Disassemble/ remove (4) bad micro channel condenser coils or industry standard Install (4) new condenser coils approx. 44x78 inches Disassemble/remove old marquee display Install new scrolling marquee display Add refrigerant – 410A Leak and vacuum test system Startup to ensure proper operation Invitation to Bid South chiller Disassemble/remove (1) bad compressor Furnish and Install (1) New Compressor - 25 h/p or match existing Disassemble/remove bad contactor and filter drier Furnish and install contactor and liquid line filter drier Add refrigerant – 410A Leak and vacuum test system Startup to ensure proper operation A. Refrigerant Coils: 1. Coils rated and tested in accordance with AHRI 410. 2. Tubes: Material to consist of seamless copper, mechanically expanded to fins; appropriate tube joining methods based on tube material. 3. Fins: Material to consist of aluminum or copper, continuous plate type with full fin collars. Maximum of 12 fins per inch (FPI). 4. Casing: ASTM A666, Type 304 stainless steel, minimum 0.0625 inch thick for slip-in or flanged mounting. 5. Maximum face velocity shall not exceed 450FPM. 6. Suction Header: Construct of nonferrous material with tube connection appropriate to header material provided. ASTM B88, Type L copper tube with brazed joints. 7. Liquid distributor: Brass or copper venture type with seamless copper distribution tubes; maximum 12 or 18 circuits per distributor. ASTM B88, Type L copper tube with brazed joints. 8. Configuration: Down feed with bottom suction to prevent oil trapping. 9. Acceptable Factory Testing Methods: a. Proof test at 1.5 times the maximum operating pressure and leak test at the maximum operating temperature. b. Perform hydrostatic testing for coils with removable headers in accordance with approved shop drawings and normally accepted means and methods Please use the following link to view Bid Opening: Meeting ID meet.google.com/qos-axae-ok

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents