Similar Projects
Sterling Development Assisted Living Facility
New Construction - 56,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Franklin, IN 46131

Arts and Municipal Complex
New Construction
Post-Bid
Fishers, IN 46038

Green Oaks of Valparaiso
New Construction
Pending Verification
Valparaiso, IN 46385

Lantern Commons - Residential Mixed-Use
New Construction
Pending Verification
Westfield, IN 46074

Belmont at Tipton Lakes Subdivision
New Construction
Construction
Columbus, IN 47201

Senior Living Facility
New Construction
Construction
Warsaw, IN 46580

Crown Point Christian Village Expansion
Renovation, Addition
Pending Verification
Winfield, IN 46307

Carolyn Mosby Senior High Rise
Renovation
Sub-Bidding
Gary, IN 46402

Recreation Center
New Construction
Post-Bid
Fishers, IN

Assisted Living Center
New Construction - 12,738 SF
Pending Verification
Huntingburg, IN 47542

Green Oaks of Goshen Assisted Living Facility
New Construction
Conception
$28,000,000 est. value
Goshen, IN 46528

Last Updated 10/20/2021 01:19 PM
Project Title

Wyndmoor of Portage

Physical Address View project details and contacts
City, State (County) Portage, IN 46368   (Porter County)
Category(s) Residential
Sub-Category(s) Assisted Living Facility
Contracting Method
Project Status General Contractor Construction Commenced 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Assisted Living Facility, 14,267 SF Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents