Similar Projects
Eastview Village
New Construction - 75,182 SF
Conception
Saco, ME 04072

Pearl Street Redevelopment
New Construction
Conception
Biddeford, ME 04005

Saco Harborside
New Construction
Design
Saco, ME 04072

Gooch Street Mixed Use
Renovation
Design
Biddeford, ME 04005

Culvert Replacement - Eliot - Region 1
Infrastructure
Bidding
$600,000 CJ est. value
Eliot, ME 03903

Heritage Woods
New Construction, Infrastructure
Sub-Bidding
$4,000,000 CJ est. value
Saco, ME 04072

Paving Bids
Infrastructure
Post-Bid
$80,000 CJ est. value
Hollis Center, ME 04042

RFQ Construction Manager at Risk - York Town Hall Renovation and Expansion Construction Management Services
Addition, Demolition, Renovation, Infrastructure - 14,060 SF
Post-Bid
$5,190,000 CJ est. value
York, ME 03909

Statewide Geotechnical Drilling
Infrastructure
Results

Joint National Guard Vehicle Maintenance Shop
LEED Certification, New Construction, Infrastructure
Results
$24,692,742 CJ est. value
Saco, ME 04072

Seacoast Residences
New Construction - 3,000 SF
Construction
$56,000,000 est. value
Kittery, ME 03904

The Mills at Pepperell
Renovation
Pending Verification
Biddeford, ME 04005

Roberts Street Apartments Phase 1
New Construction - 4,264 SF
Pending Verification
Sanford, ME 04073

Devine Capital Alfred Street Housing
New Construction
Conception
Biddeford, ME 04005

Adams Point Housing
Renovation - 9,050 SF
Design
Biddeford, ME 04005

Last Updated 08/23/2022 12:32 PM
Project Title

989 Portland Multi Residential

Physical Address View project details and contacts
City, State (County) Saco, ME 04072   (York County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Final Subdivision was approved by the Saco Planning commission June 2022. A building permit application has not been submitted. Information regarding a general contractor and construction timeline is not known.

Details

3 Stories Above Grade, Apartments, 120 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents