Similar Projects
Generator Waste Water Plant
Bidding
New Baltimore, MI

Gibbing UPS Replacement and Renovation
Bidding
Sterling Heights, MI

Storm Water Mechanical and Electrical Systems Replacement Project
Post-Bid
Harrison Township, MI 48045

PAC Upgrades
Post-Bid
Sterling Heights, MI 48312

2019 LED Retrofit Materials
Results
Less than $8,820 est. value
Richmond, MI

Natural Gas Generators
Results
Less than $95,700 est. value
Sterling Heights, MI

Electrical Contractor
Term Contract
Bidding
MI

High School Electrical Upgrades
Post-Bid
Sterling Heights, MI

Transmission Overhauling
Results
Sterling Heights, MI

Building CG Generator
Post-Bid
Macomb, MI 26099

City Campus Renovation Project - Lighting Fixture Pre-Purchase
Results
Sterling Heights, MI

Theater and Stage Equipment
Post-Bid
MI

Two (2) New Condition Laser Distance Meters
Results
MI

Universal Power Supply
Post-Bid
Fraser, MI

Eight (8) New Condition Personal Voltage Detectors, HD Electric Model VWS-20 or Approved Equivalent
Results
Less than $1,840 est. value
Mount Clemens, MI

Last Updated 11/26/2019 08:51 AM
Project Title

Install Explosion Proof Receptacles - Hangar 35

Physical Address View project details and contacts
City, State (County) Harrison Township, MI 48045   (Macomb County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor/Vendors will be permitted to perform an onsite field investigation at Bldg.35 the Contractor shall obtain field dimensions, equipment materials cost to provide the Government with a complete bid package to perform the required installation. This shall include installing GFCI breakers in existing panel, seal off conduit bodies, threaded ridged conduit, Explosion proof boxes, Devices, and covers to complete a class 1 div 2 installation. Basis of design will meet or exceed the specified Appleton EBR Receptacles with interlocked circuit breaker. Contractor is responsible for all remaining work effort in order to provide an acceptable final product that meets the requirements of this Statement of Work (SOW) and drawings.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents