Similar Projects
Last Updated | 01/18/2023 06:36 AM |
Project Title | Greater Glorieta Regional Well |
Physical Address | View project details and contacts |
City, State (County) | Glorieta, NM 87535 (Santa Fe County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,752,512 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Santa Fe Growth Management Department request bids for the purpose of procuring a licensed construction company to upgrade the Greater Glorieta Mutual Domestic Water Consumer Association's (MDWCA) infrastructure and water quality. The well will be located at the site of the MDWCA's existing well at 80 Avenida Ponderosa, Glorieta, NM 87535 or approximately 35.574079 latitude and -105.76012 longitude. This project will replace the existing well with a deep water supply well (at a depth of 1,200-1,500 ft. into the Madera formation) which will directly benefit the combined Glorieta Village and Estates communities as a long term water source to address the public health risk of elevated radium above drinking water standards, a regional water supply source for both communities in the near term, a potential water source of East Glorieta should that subsystem be physically connected in the future, and a source of system redundancy for emergency purposes. The project will include siting and drilling a hole approximately 14 in. in width and 1,200 ft. in depth into the Madera Formation and constructing a water supply well and appurtenances including a well head, pump, approximately 50 ft. of pipe and fittings to connect to the existing distribution system. The well and connections will be fenced and the area graded for positive drainage following construction of the well. A Preliminary Engineering Report, complete with a geologic formation study, has been completed. Bids will be held for ninety (90) days subject to all action by the County. Santa Fe County reserves the right to reject any and all bids in part or in whole. A complete bid package must be submitted in a sealed container indicating the bid title and number along with the bidding firm's name and address clearly marked on the outside of the container. If you plan on attending in person please email apattersonsanchez@santafecountynm.gov. EQUAL OPPORTUNITY EMPLOYMENT: All qualified bidders will receive consideration of contract(s) without regard to race, color, religion, sex, national origin, ancestry, age, physical and mental handicap, serious mental condition, disability, spousal affiliation, sexual orientation or gender identity. This Project is funded in whole or in part by a grant from the state of New Mexico Small Cities Community Development Block Grant Program and is subject to requirements of the United States Department of Housing and Urban Development and the funding agency. Liquidated Damages: $500.00 per each working day that expires after the date of substantial completion until substantial completion is achieved and a certificate of Substantial Completion is issued by the County |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |