RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

PA 764 - 17th St to Pleasant Valley
Infrastructure, Alteration
Design
$2,399,483 est. value
Altoona, PA 16602

PA 36 Mill Run Bridge
Infrastructure, Renovation
Design
$2,185,454 CJ est. value
Hollidaysburg, PA 16648

RFQ Design - Architect/Engineering Services for the Design of CDC/NIOSH Consolidated Cincinnati Research Facilities, Cincinnati, OH
Demolition, New Construction, Infrastructure - 235,000 SF
Bidding
$100,000,000 CJ est. value
Cincinnati, OH 45206

South Poplar Run Bridge
Infrastructure
Bidding
$2,500,000 CJ est. value
Claysburg, PA 16625

Snow Removal
Term Contract
Sub-Bidding
Birmingham, PA 16686

Fort Roberdeau Site Improvements Project
Infrastructure
Post-Bid
Tyrone, PA

Construction of the Replace Water Main at Gillans Run
Infrastructure
Post-Bid
Duncansville, PA

Old Frankstown Road Sewer Line Extension Project
Infrastructure
Results
Hollidaysburg, PA 16648

Leopold Park Improvements - Site
Infrastructure
Results
$800,000 est. value
Altoona, PA 16601

Frankstown Road to Mill Run Road
Infrastructure
Design
$2,427,067 CJ est. value
Altoona, PA 16602

Stormwater Improvements Walnut and Oak Avenues
Infrastructure
Bidding
$700,000 CJ est. value
Altoona, PA 16601

East 5th Street Waterline Replacement Project
Infrastructure
Post-Bid
Bellwood, PA 16617

Everett Road Water Meter Supply
Infrastructure
Results
East Freedom, PA

Last Updated 08/15/2022 03:02 PM
Project Title

13th Avenue Stormwater Improvements and Signal Upgrades Between 12th Street and 13th Street

Physical Address View project details and contacts
City, State (County) Altoona, PA 16601   (Blair County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,628,746 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 15, 2022, bids were rejected, no information for rebid.** 13th Avenue Stormwater Improvements and Signal Upgrades Between 12th Street and 13th Street Work performed on this project to be as per current Pennsylvania Department of Transportation Publication 408, as amended and revised. Either an original Certified Check, Official Check, Cashier's Check, or Bid Bond drawn to the order of the "City of Altoona" equal to ten (10%) percent of the amount of the bid must be submitted with the proposal. Note that the Bid Bond must be in effect for a period of sixty (60) days from the bid opening date. CLARIFICATION DEADLINE 6/22/2022 12:00 PM Mayor and City Council reserve the right to reject any or all bids and waive any informality not material to the bid and to award the contract as may be deemed to the best interest of the City of Altoona. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. Work performed on this project will be subject to prevailing wage rates as established by the Pennsylvania Department of Labor and Industry. Contractors or sub-contractors interested in submitting a proposal for this project must be currently pre-qualified with the Department of Transportation's ECMS system that allows them to perform new construction of traffic signals and related structures. . The entire contract must be complete by June 16, 2023.

Details

Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents