Similar Projects
Last Updated | 02/01/2019 09:52 AM |
Project Title | Rubbish and Recycle Removal |
Physical Address | View project details and contacts |
City, State (County) | Bangor, Belfast, Brewer, ME (Penobscot, Waldo Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Hauling |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Recycling containers must be single stream to include: cardboard, all paper items, plastics #1-7, aluminum and tin cans and glass. Provider will be responsible for clearly labeling the containers and dumpsters.The Provider will be required to clean up all debris spilled during the pick up process. The Provider shall record the quantity (tons or pounds) of waste picked up. This includes trash/rubbish, and recycled items. Data shall include waste type, quantity and location. Recycling types should be separated for reporting: glass, metal, plastic, paper and cardboard. If using a non-sorting recycling method, the data may be consolidated. Report for the 1st period in the current year is 1 October to 31 March due no later than 1 May and for the 2nd period 1 April to 30 September due no later than 1 November. Data may be submitted by transaction or by consolidation for the period. In the event that the Provider is unable to provide actual weights of materials collected then the Provider shall provide an estimate of yardage and weight pick up, to include an explanation for the estimated data. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |