Similar Projects
Cold Mix Asphalt and Parking/Road Striping Services
Term Contract
Post-Bid
Austin, TX 78759

Signage for City of Irving Special Events
Post-Bid
Irving, TX 75060

Fabricate and Deliver Various Signs and Related Items
Term Contract
Results
Less than $190,000 est. value
Houston, TX

McAllen International Airport - Monument and Wayfinding Signage
Results
Less than $200,000 est. value
McAllen, TX 78503

Blank-Out Signs
Post-Bid
Irving, TX 75060

Traffic Pavement Marking System Service
Results
Dallas, TX 75390

Radar Signs
Post-Bid
Irving, TX 75060

Retroreflectorized Pavement Markings and Markers
Results
Less than $1,305,560 est. value
TX

Wall Signs and Installation
Post-Bid
Houston, TX 77009

Master Wayfinding and Signage Program
Results
$95,630 est. value
Lewisville, TX 75057

PLA Sources Sought Notice
Post-Bid
$250,000,000 to $500,000,000 est. value
McAllen, TX

Reflectorized Pavement Markings and Marker
Results
Less than $1,175,569 est. value
TX

Install Shortline and Specialty Markings
Post-Bid
Less than $198,966 est. value
TX

Campus-Wide Interior Wayfinding Signage Services
Term Contract
Results
$999,000 est. value
Dallas, TX 75390

Install Shortline and Specialty Markings
Post-Bid
Less than $201,502 est. value
TX

Last Updated 12/17/2019 01:48 PM
Project Title

Safety Improvement Projects

Physical Address View project details and contacts
City, State (County) TX   (Stephens County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,965,355
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing Row Sta 1.000 1 110 6001 Excavation (Roadway) Cy 180.000 2 112 6001 Subgrade Widening (Ord Comp) Sta 172.000 3 132 6005 Embankment (Final)(Ord Comp)(Ty c) Cy 1,519.100 4 162 6003 Straw Or Hay Mulch Sy 47,857.000 5 164 6003 Broadcast Seed (Perm) (Rural) (Clay) Sy 2,800.000 6 164 6009 Broadcast Seed (Temp) (Warm) Sy 1,400.000 7 164 6011 Broadcast Seed (Temp) (Cool) Sy 1,400.000 8 164 6035 Drill Seeding (Perm) (Rural) (Clay) Sy 23,929.000 9 164 6043 Drill Seeding (Temp) (Cool) Sy 23,929.000 10 168 6001 Vegetative Watering Mg 1,252.000 11 216 6001 Proof Rolling Hr 40.000 12 247 6053 Fl Bs (Cmp In Plc)(Tyd Gr1-2)(Fnal Pos) Cy 6,380.000 13 251 6215 Rework Bs Matl (Ty b) (5") (Ord Comp) Sy 53,511.000 14 310 6012 Prime Coat (Rc-250) Gal 11,773.000 15 316 6017 Asph (Ac-20-5tr) Gal 35,539.000 16 316 6177 Aggr(Ty-b Gr-5 Sac-b) Cy 428.000 17 316 6224 Aggr(Ty-Pb Gr-4 Sac-b) Cy 969.000 18 334 6030 Hmcl Acp Ty-b Sac-b Ac-1.5 Ton 20.000 19 334 6102 Hmcl Acp Ty-f Sac-b Ac-1.5 Ton 6.000 20 351 6026 Flex Pavement Structure Repair (5"-10") Sy 730.000 21 400 6005 Cem Stabil Bkfl Cy 908.000 22 401 6001 Flowable Backfill Cy 68.800 23 403 6001 Temporary Spl Shoring Sf 837.000 24 420 6051 Cl c Conc (Culv) Cy 41.700 25 420 6136 Cl c Conc (Rac-r) Cy 6.600 26 432 6002 Riprap (Conc)(5 In) Cy 39.600 27 432 6033 Riprap (Stone Protection)(18 In) Cy 34.000 28 432 6045 Riprap (Mow Strip)(4 In) Cy 181.600 29 450 6018 Rail (Ty t631) Lf 100.000 30 462 6002 Conc Box Culv (3 Ft x 3 Ft) Lf 140.000 31 462 6003 Conc Box Culv (4 Ft x 2 Ft) Lf 58.000 32 462 6004 Conc Box Culv (4 Ft x 3 Ft) Lf 70.000 33 462 6005 Conc Box Culv (4 Ft x 4 Ft) Lf 124.000 34 462 6021 Conc Box Culv (8 Ft x 6 Ft) Lf 66.000 35 464 6003 Rc Pipe (Cl Iii)(18 In) Lf 104.000 36 464 6005 Rc Pipe (Cl Iii)(24 In) Lf 183.000 37 464 6007 Rc Pipe (Cl Iii)(30 In) Lf 96.000 38 464 6008 Rc Pipe (Cl Iii)(36 In) Lf 162.000 39 466 6101 Headwall (Ch - Pw - 0) (Dia= 36 In) Ea 2.000 40 466 6179 Wingwall (Pw - 1) (Hw=4 Ft) Ea 4.000 41 466 6182 Wingwall (Pw - 1) (Hw=7 Ft) Ea 2.000 42 467 6105 Set (Ty i)(s=3 Ft)(Hw=3ft)(3:1)(c) Ea 1.000 43 467 6106 Set (Ty i)(s=3 Ft)(Hw=3ft)(4:1)(c) Ea 1.000 44 467 6144 Set (Ty i)(s= 4 Ft)(Hw= 4 Ft)(4:1) (c) Ea 2.000 45 467 6150 Set (Ty i)(s= 4 Ft)(Hw= 5 Ft)(4:1) (c) Ea 1.000 46 467 6154 Set (Ty i)(s= 4 Ft)(Hw= 6 Ft)(3:1) (c) Ea 1.000 47 467 6211 Set (Ty i)(s= 6 Ft)(Hw= 4 Ft)(3:1) (c) Ea 2.000 48 467 6248 Set (Ty i)(s= 7 Ft)(Hw= 5 Ft)(3:1) (c) Ea 2.000 49 467 6279 Set (Ty i)(s= 8 Ft)(Hw= 6 Ft)(3:1) (c) Ea 1.000 50 467 6280 Set (Ty i)(s= 8 Ft)(Hw= 6 Ft)(4:1) (c) Ea 1.000 51 467 6359 Set (Ty Ii) (18 In) (Rcp) (4: 1) (p) Ea 6.000 52 467 6375 Set (Ty Ii) (24 In) (Cmp) (3: 1) (c) Ea 5.000 53 467 6379 Set (Ty Ii) (24 In) (Cmp) (6: 1) (c) Ea 1.000 54 467 6388 Set (Ty Ii) (24 In) (Rcp) (3: 1) (c) Ea 1.000 55 467 6390 Set (Ty Ii) (24 In) (Rcp) (4: 1) (c) Ea 7.000 56 467 6391 Set (Ty Ii) (24 In) (Rcp) (4: 1) (p) Ea 6.000 57 467 6406 Set (Ty Ii) (30 In) (Cmp) (3: 1) (c) Ea 1.000 58 467 6408 Set (Ty Ii) (30 In) (Cmp) (4: 1) (c) Ea 2.000 59 467 6409 Set (Ty Ii) (30 In) (Cmp) (6: 1) (c) Ea 1.000 60 467 6419 Set (Ty Ii) (30 In) (Rcp) (4: 1) (c) Ea 4.000 61 467 6451 Set (Ty Ii) (36 In) (Rcp) (4: 1) (p) Ea 4.000 62 476 6013 Jack Bor Or Tun Pipe(24 In)(Rc)(Cl Iii) Lf 59.000 63 496 6016 Remov Str (Pipe) Ea 19.000 64 500 6001 Mobilization Ls 1.000 65 502 6001 Barricades, Signs And Traffic Handling Mo 13.000 66 506 6002 Rock Filter Dams (Install) (Ty 2) Lf 1,080.000 67 506 6011 Rock Filter Dams (Remove) Lf 1,080.000 68 506 6020 Construction Exits (Install) (Ty 1) Sy 336.000 69 506 6024 Construction Exits (Remove) Sy 336.000 70 506 6038 Temp Sedmt Cont Fence (Install) Lf 17,017.000 71 506 6039 Temp Sedmt Cont Fence (Remove) Lf 17,017.000 72 506 6041 Biodeg Erosn Cont Logs (Instl) (12") Lf 2,730.000 73 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 2,730.000 74 508 6001 Constructing Detours Sy 872.000 75 512 6009 Port Ctb (Fur & Inst)(Low Prof)(Ty 1) Lf 280.000 76 512 6010 Port Ctb (Fur & Inst)(Low Prof)(Ty 2) Lf 80.000 77 512 6033 Port Ctb (Move)(Low Prof)(Ty 1) Lf 700.000 78 512 6034 Port Ctb (Move)(Low Prof)(Ty 2) Lf 200.000 79 512 6057 Port Ctb (Remove)(Low Prof)(Ty 1) Lf 280.000 80 512 6058 Port Ctb (Remove)(Low Prof)(Ty 2) Lf 80.000 81 530 6003 Intersections (Surf Treat) Sy 902.000 82 530 6006 Driveways (Surf Treat) Sy 277.000 83 530 6009 Turnouts (Surf Treat) Sy 37.000 84 540 6002 Mtl w-Beam Gd Fen (Steel Post) Lf 3,062.500 85 540 6033 Mtl Bm Gd Fen (Long Span System) Ea 6.000 86 544 6001 Guardrail End Treatment (Install) Ea 28.000 87 552 6003 Wire Fence (Ty c) Lf 50.000 88 552 6008 Wire Fence (Water Gap) Lf 20.000 89 560 6007 Mailbox Install-s (Wc-Post) Ty 3 Ea 1.000 90 644 6001 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(p) Ea 9.000 91 644 6004 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(t) Ea 2.000 92 644 6030 In Sm Rd Sn Sup&Am Tys80(1)Sa(t) Ea 11.000 93 644 6076 Remove Sm Rd Sn Sup&Am Ea 22.000 94 658 6047 Instl Om Assm (Om-2y)(Wc)Gnd Ea 8.000 95 658 6062 Instl Del Assm (d-Sw)Sz 1(Brf)Gf2(Bi) Ea 66.000 96 658 6073 Instl Om Assm (Om-2y)(Wc)Gnd(Bi) Ea 26.000 97 662 6004 Wk Zn Pav Mrk Non-Remov (w)4"(Sld) Lf 38,146.000 98 662 6034 Wk Zn Pav Mrk Non-Remov (y)4"(Sld) Lf 76,292.000 99 666 6282 Ref Prof Pav Mrk Ty i(w)4"(Sld)(060mil) Lf 38,146.000 100 666 6287 Ref Prof Pav Mrk Ty i(y)4"(Sld)(090mil) Lf 22,948.000 101 666 6291 Ref Prof Pav Mrk Ty i(y)4"(Brk)(090mil) Lf 4,793.000 102 672 6009 Refl Pav Mrkr Ty Ii-a-a Ea 766.000 103 4091 6001 Dewatering Bags Ea 2.000 104 6056 6001 Preformed In-Lane(Trans) Rumble Strip Lf 160.000 105 6056 6002 Preformed Centerline Rumble Strip Lf 385.000 106 6185 6001 Tma (Stationary) Ea 4.000 107 6185 6002 Tma (Stationary) Day 32.000 108

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Painted Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents